Listing of Statistics for Run2-2025 (Created Sat Jun 21 22:05:03 CDT 2025)
User periods in this interval
06/03/2025 08:00 To 06/09/2025 08:00 144.00 Hours, Delivered Beam: 143.08 Hours, 1 Fault(s),143.08 MTBF, 99.36% of Sched. Time
06/10/2025 08:00 To 06/16/2025 09:04 145.07 Hours, Delivered Beam: 142.02 Hours, 2 Fault(s), 71.01 MTBF, 97.90% of Sched. Time
06/18/2025 08:00 To 06/21/2025 22:01 86.02 Hours, Delivered Beam: 84.84 Hours, 1 Fault(s), 84.84 MTBF, 98.64% of Sched. Time
Total Amount of User Time in this interval | 375.08 Hours | Delivered Beam | 369.95 Hours |
Percentage of Scheduled Time (*) | 98.63 % |
Mean Time Between Faults (MTBF) | 92.49 Hours |
Downtime During Period | 5.13 Hours |
Total integrated Current During This Period | 73.97 A-hr |
Mean Fill Duration in Period | 73.99 Hours |
Faults per Day of Delivered Beam | 0.26 |
Total Number of Faults | 4 |
Valid fills Beginning in this Time Interval | | | |
Fill # | Start | | End | Duration (min: 1.0) | Reason for Fill Termination | Length of Downtime | Downtime is associated with the end of a fill. The first fill of a period will have any downtime before the fill on the line above.
|
|
| 0.00 |
|
# 1 | 06/03 08:00 | To | 06/08 06:54 | 118.90 | RF-2 trip [RF] | 0.91 |
|
# 2 | 06/08 07:49 | To | 06/09 07:59 | 24.18 | Int Dump: End of Period | 0.00 | |
|
|
| 0.00 |
|
# 3 | 06/10 08:00 | To | 06/12 15:42 | 55.70 | Power event {FAC] | 1.70 |
|
# 4 | 06/12 17:23 | To | 06/16 05:22 | 83.98 | S29 BPLD trip [UNK] | 0.28 |
|
# 5 | 06/16 05:39 | To | 06/16 08:00 | 2.35 | Int Dump: End of Period | 1.07 | |
|
|
| 0.00 |
|
# 6 | 06/18 08:00 | To | 06/18 13:43 | 5.73 | Lightning strike [OTH] | 1.17 |
|
# 7 | 06/18 14:54 | To | 06/21 22:01 | 79.11 | Fill Ongoing | -0.00 | |
|
The information on this page is automatically generated and may contain errors.
An official operations statistics page will be posted at the end of each user period.