Listing of Statistics for Run1-2000 (Created Mon May 03 17:55:34 CDT 2004) Total Amount of User Time in this interval 1510.91 Hours User periods in this interval ----------------------------- 01/19/2000 08:01 To 01/25/2000 08:00 143.98 Hours, Delivered Beam: 134.96 Hours, 4 Fault(s), 33.74 MTBF, 93.74% of Sched. Time 01/25/2000 16:00 To 01/31/2000 08:00 136.00 Hours, Delivered Beam: 124.67 Hours, 6 Fault(s), 20.78 MTBF, 91.67% of Sched. Time 02/02/2000 08:00 To 02/08/2000 08:00 144.00 Hours, Delivered Beam: 140.57 Hours, 3 Fault(s), 46.86 MTBF, 97.62% of Sched. Time 02/08/2000 16:01 To 02/14/2000 08:00 135.98 Hours, Delivered Beam: 132.06 Hours, 4 Fault(s), 33.02 MTBF, 97.12% of Sched. Time 02/16/2000 08:01 To 02/22/2000 08:02 144.02 Hours, Delivered Beam: 135.35 Hours, 5 Fault(s), 27.07 MTBF, 93.98% of Sched. Time 02/22/2000 16:00 To 02/28/2000 08:00 136.00 Hours, Delivered Beam: 131.83 Hours, 5 Fault(s), 26.37 MTBF, 96.93% of Sched. Time 03/01/2000 08:00 To 03/07/2000 08:00 144.00 Hours, Delivered Beam: 142.71 Hours, 2 Fault(s), 71.36 MTBF, 99.11% of Sched. Time 03/07/2000 16:01 To 03/13/2000 08:00 135.98 Hours, Delivered Beam: 134.15 Hours, 2 Fault(s), 67.08 MTBF, 98.65% of Sched. Time 03/15/2000 08:01 To 03/21/2000 08:00 143.98 Hours, Delivered Beam: 141.44 Hours, 1 Fault(s), 141.44 MTBF, 98.23% of Sched. Time 03/21/2000 16:01 To 03/27/2000 08:00 135.98 Hours, Delivered Beam: 133.60 Hours, 3 Fault(s), 44.53 MTBF, 98.25% of Sched. Time 03/29/2000 08:00 To 04/03/2000 00:01 111.02 Hours, Delivered Beam: 110.99 Hours, 0 Fault(s), 110.99 MTBF, 99.98% of Sched. Time Delivered Beam 1462.35 Hours Percentage of Scheduled Time 96.79 % Downtime During Period 48.56 Hours Percentage of scheduled time SR current > 10 ma 97.55 % Average Delivered Current During This Period 81.71 mA Total integrated Current During This Period 119.50 A-hr Mean Fill Duration in Period 40.62 Hours Mean Fill Duration from Poisson Fit 49.38 Hours Mean Time Between Faults (MTBF) 41.78 Hours Faults per Day of Delivered Beam 0.57 Scheduled Topup Time 0.00 Hours Length Downtime is associated with the end of a fill. Valid fills Beginning in this Time Interval| Reason for | of The first fill of a period will have any Fill# Start End Duration | Fill Termination | Downtime downtime before the fill on the line above. (min: 0.5) | | ------------------------------------------------------------------------------------------------------------------------------------ | | 3.08 power glitch, rad monitor, orbit problems # 2 01/19 11:05 To 01/20 09:03 21.96 | SR Dipole glitch [OTH] | 0.91 recovery, restandardization # 4 01/20 09:58 To 01/20 13:52 3.91 | SR Dipole glitch [OTH] | 0.67 recovery # 6 01/20 14:32 To 01/21 16:03 25.52 | PSS trip [ISI] | 2.31 investigation, recovery, rf system problems # 8 01/21 18:21 To 01/22 11:22 17.01 | S17B:Q3 trip [PS] | 2.04 subsequent problems with S17B:Q3, booster dip supply # 12 01/22 13:25 To 01/25 07:59 66.57 | Int Dump: End of Period | 0.01 ------------------------------------------------------------------------------------------------------------------------------------ | | 0.54 rf personnel rad monitor problems # 17 01/25 16:32 To 01/26 07:44 15.20 | WF dump for phase [OPS] | 0.26 refill # 18 01/26 07:59 To 01/27 01:55 17.93 | S24/25 R2 Raw trip [PS] | 0.59 recovery # 22 01/27 02:31 To 01/28 14:54 36.39 | h2o glitch trip ps [PS] | 1.14 recovery # 24 01/28 16:02 To 01/29 15:08 23.10 | Unknown beam motion[OTH] | 0.78 recovery? # 26 01/29 15:55 To 01/30 06:15 14.33 | Power glitch [OTH] | 1.22 recovery # 27 01/30 07:28 To 01/30 10:12 2.74 | power glitch [OTH] | 6.78 recovery, L1 modulator problems # 28 01/30 16:59 To 01/31 07:59 15.00 | Int Dump: End of Period | 0.01 ------------------------------------------------------------------------------------------------------------------------------------ | | 0.01 # 32 02/02 08:00 To 02/03 14:56 30.92 | PSS trip at 2-BM [ISI] | 1.70 recovery # 34 02/03 16:37 To 02/03 17:25 0.80 | PSS trip at 20-BM [ISI] | 1.23 recovery # 38 02/03 18:39 To 02/07 11:00 88.35 | PS related work [PS] | 0.49 recovery # 45 02/07 11:29 To 02/08 07:59 20.50 | Int Dump: End of Period | 0.01 ..... ------------------------------------------------------------------------------------------------------------------------------------ | | 0.01 # 48 02/08 16:01 To 02/10 09:50 41.82 | Com Ed powerGlitch [OTH] | 0.65 recovery # 51 02/10 10:29 To 02/10 14:52 4.38 | rf PSS trip [RF] | 1.00 recovery, problem with rf-gun # 53 02/10 15:52 To 02/11 10:06 18.24 | Beam motion [OAG] | 1.70 investigation and recovery # 57 02/11 11:48 To 02/13 11:47 47.98 | rf3 trip [RF] | 0.56 recovery # 61 02/13 12:21 To 02/14 07:59 19.64 | Int Dump: End of Period | 0.01 ..... ------------------------------------------------------------------------------------------------------------------------------------ | | 1.70 Problems with S38:BQ5, converter replacement # 66 02/16 09:42 To 02/18 07:47 46.07 | P0 timing problem [CTL] | 0.33 recovery # 68 02/18 08:07 To 02/18 10:13 2.11 | srrf IG fault [VAC] | 0.28 recovery # 69 02/18 10:30 To 02/18 12:50 2.33 | srrf IG fault [VAC] | 2.85 replacement of IG controllers # 71 02/18 15:41 To 02/19 01:26 9.74 | ACIS trip [CTL] | 2.79 recovery, reboot of iocs39vp, recal of scrapers # 75 02/19 04:13 To 02/21 13:40 57.44 | Not identifiable [OTH] | 0.68 recovery # 79 02/21 14:21 To 02/22 08:00 17.66 | Int Dump: End of Period | 0.02 ------------------------------------------------------------------------------------------------------------------------------------ | | 0.02 # 82 02/22 16:01 To 02/24 01:08 33.12 | Power glitch [OTH] | 0.92 recovery # 85 02/24 02:03 To 02/24 19:44 17.68 | Scraper problem [DIA] | 0.85 recovery # 87 02/24 20:35 To 02/25 21:10 24.58 | File Problem [CTL] | 0.56 recovery, controls problems # 89 02/25 21:44 To 02/26 07:41 9.96 | rf4 pow mon flt [RF] | 0.49 recovery, linac gun problem # 91 02/26 08:11 To 02/27 10:21 26.17 | Power glitch [OTH] | 1.32 recovery # 94 02/27 11:40 To 02/28 07:59 20.32 | Int Dump: End of Period | 0.00 ------------------------------------------------------------------------------------------------------------------------------------ | | 0.02 # 99 03/01 08:00 To 03/06 01:14 113.22 | S30A:Q2 lost output [PS] | 0.43 recovery #105 03/06 01:40 To 03/06 13:20 11.66 | 8BM EPS/PSS work [ISI] | 0.83 recovery, RG2 kicker problems #108 03/06 14:09 To 03/07 07:59 17.83 | Int Dump: End of Period | 0.01 ------------------------------------------------------------------------------------------------------------------------------------ | | 0.18 #109 03/07 16:11 To 03/07 18:48 2.61 | rf PSS fault [RF] | 0.71 recovery #112 03/07 19:31 To 03/10 14:42 67.19 | VM-09-VV02 closed [CTL] | 0.94 recovery #119 03/10 15:38 To 03/13 07:59 64.35 | Int Dump: End of Period | 0.01 ------------------------------------------------------------------------------------------------------------------------------------ | | -0.01 #127 03/15 08:00 To 03/20 20:06 132.10 | S40/1 raw PS trip [PS] | 2.55 trouble shooting, recovery #134 03/20 22:39 To 03/21 07:59 9.33 | Int Dump: End of Period | 0.00 ------------------------------------------------------------------------------------------------------------------------------------ | | 0.01 #135 03/21 16:01 To 03/22 19:25 27.39 | SRF4 kly out arc [RF] | 0.82 recovery, restandardization of SR quads #138 03/22 20:14 To 03/24 07:48 35.56 | wf most bnches lost[OTH] | 0.97 recovery, ioc reboots #139 03/24 08:46 To 03/24 15:01 6.25 | love cntrl pwr [CTL] | 0.58 recovery #141 03/24 15:35 To 03/27 07:59 64.40 | Int Dump: End of Period | 0.00 ------------------------------------------------------------------------------------------------------------------------------------ | | 0.01 #145 03/29 08:00 To 04/03 00:00 110.99 | Int Dump: End of Period | 0.01