Listing of Fills for Run 2000-3
Total Amount of User Time in this interval
1264.15 Hours
User periods in this interval
-----------------------------
08/03/2000 08:00 To 08/08/2000 08:00
120.00 Hours
08/08/2000 16:00 To 08/15/2000 08:00
160.00 Hours
08/15/2000 16:00 To 08/22/2000 08:00
160.00 Hours
08/22/2000 16:00 To 08/29/2000 08:00
160.00 Hours
08/29/2000 16:00 To 09/04/2000 08:00
136.00 Hours
09/06/2000 08:00 To 09/12/2000 08:00
144.00 Hours
09/12/2000 16:00 To 09/18/2000 08:00
136.00 Hours
09/20/2000 08:00 To 09/26/2000 08:10
144.15 Hours
09/26/2000 16:00 To 09/30/2000 24:00
104.00 Hours
Delivered Beam 1109.46 Hours
Percentage of Scheduled Time 87.76 %
Downtime During Period 139.14 Hours
Percentage of scheduled time SR current
> 10 ma 91.84 %
Average Delivered Current During This
Period 79.32 ma
Total integrated Current During This Period
89.23 A-hr
Mean Time Between Faults (MTBF) 32.63 Hours
Faults per Day of Delivered Beam 0.74
Length Downtime is
associated with the end of a fill.
Valid fills Beginning in this Time Interval| Reason for | of The first fill of a period will have any
Fill# Start End Duration | Fill
Termination | Downtime downtime before the fill on the line
above.
------------------------------------------------------------------------------------------------------------------------------------
| | 33.00 S36 rf
cavity vacuum problems
#
2 08/04 17:00 To
08/05 20:19 27.33 | rf3 circ fault [RF] | 0.74 recovery
#
7 08/05 21:03 To
08/06 08:28 11.41 | S36 cav vac prob [VAC] | 47.52 repair - recovery
------------------------------------------------------------------------------------------------------------------------------------
| | 31.75
#
8 08/09 23:45 To
08/10 07:59 8.20 | rf PS trip [RF] | 0.66
recovery
# 14
08/10 08:38 To 08/11 20:00 35.36 | Vac burst, S36rf [VAC] |
0.44 recovery
# 19
08/11 20:27 To 08/12 19:56 23.48 | PS problem, sec
2-3 [PS] | 0.69 recovery, ID gap
problem
# 22
08/12 20:38 To 08/15 08:00 59.35 | Int Dump: End of
Period | 0.00 ....
------------------------------------------------------------------------------------------------------------------------------------
| | 0.59 rf3 circ load PSS trip
# 27
08/15 16:36 To 08/17 06:50 38.23 | lightning strike [OTH] |
0.62 recovery
# 29
08/17 07:27 To 08/17 08:06 0.66 | rad mon, BPLD
rf [OTH] | 0.31 recovery
# 34
08/17 08:25 To 08/21 09:53 97.47 | Beam Motion [PS] | 0.81 recovery
# 40
08/21 10:42 To 08/22 08:00 21.30 | Int Dump: End of
Period | 0.00
------------------------------------------------------------------------------------------------------------------------------------
| | 0.00
# 42
08/22 16:00 To 08/23 00:02 8.02 | S26 MPS
trip [CTL] | 0.95 recovery, 14 & 3 ID gaps, B:BM,
L5:MO1
# 43
08/23 00:59 To 08/23 14:11 13.21 | S26 MPS trip [CTL] | 0.75 recovery
# 47
08/23 14:56 To 08/25 16:24 49.47 | S25B:V3 set point [PS] |
0.46 recovery
# 51
08/25 16:52 To 08/26 07:25 14.55 | 34ID EPS/PSS trip [ISI] |
1.67 recovery
# 53
08/26 09:05 To 08/28 03:27 42.36 | SR rf1 trip [RF] | 0.56 recovery, slow gap opening, 14ID
# 57
08/28 04:01 To 08/29 07:59 27.98 | Int Dump: End of
Period | 0.00
------------------------------------------------------------------------------------------------------------------------------------
| | 0.02
# 66
08/29 16:01 To 09/01 08:10 64.15 | rf3 trip [RF] | 0.48 recovery
# 70
09/01 08:39 To 09/01 11:40 3.02 | SR dipole S8-9
trip[OTH] | 1.24 standardize, recover
# 71
09/01 12:55 To 09/01 16:07 3.21 | RF1 T/R nitrogen [RF] |
1.01 recovery, waveguide switch
# 72
09/01 17:08 To 09/01 17:43 0.58 | Beam Motion rf4 [RF] |
0.65 recovery
# 73
09/01 18:21 To 09/02 07:22 13.01 | Beam Motion rf4 [RF] |
1.97 subsequent trips, recovery
# 75
09/02 09:20 To 09/02 10:12 0.88 | Beam motion
rf4 [RF] | 2.80 waveguide switch, recovery
# 79
09/02 13:00 To 09/04 07:59 42.99 | Int Dump: End of
Period | 0.00
------------------------------------------------------------------------------------------------------------------------------------
| | 0.00
# 82
09/06 08:00 To 09/06 19:44 11.73 | Dump for purity [OPS] |
0.35 refill
# 83
09/06 20:05 To 09/07 13:48 17.71 | PSS trip at
7ID [ISI] | 1.04 recovery
# 86
09/07 14:50 To 09/08 02:24 11.57 | S31B:V3 set point [PS] |
0.42 recovery
# 88
09/08 02:49 To 09/09 01:09 22.33 | S18B:Q1 glitch [PS] |
0.63 recovery
# 90
09/09 01:47 To 09/09 03:47 1.99 | S18B:Q1
glitch [PS] | 0.53 recovery
# 92
09/09 04:18 To 09/10 11:59 31.68 | replace S25A:S4 [PS] |
1.14 converter replacement, recovery
# 94
09/10 13:08 To 09/10 16:13 3.09 | SRrf3 HVPS trip [RF] |
0.96 troubleshoot, recover
# 96
09/10 17:11 To 09/12 07:59 38.81 | Int Dump: End of
Period | 0.00
------------------------------------------------------------------------------------------------------------------------------------
|
| 0.27 waveguide switch from rf4
# 99
09/12 16:16 To 09/13 04:01 11.75 | Bad MPS module [CTL] |
3.40 repair/recovery
#101
09/13 07:25 To 09/13 10:04 2.64 | Reboot RFSourceIOC
[CTL] | 1.10 recovery, restart linac
#102
09/13 11:10 To 09/14 00:38 13.46 | S17A:Q4 set pnt
[PS] | 0.74 recovery
#105
09/14 01:22 To 09/15 11:42 34.33 | unknown beam motion[OTH]
| 0.59 recovery
#111
09/15 12:17 To 09/18 07:59 67.69 | Int Dump: End of
Period | 0.00
------------------------------------------------------------------------------------------------------------------------------------
| | 0.00
#119
09/20 08:01 To 09/21 02:40 18.65 | VM-36-VV02
closed [CTL] | 0.76 recovery, Problems with opening ID20
Gap
#123
09/21 03:25 To 09/22 22:35 43.16 | S36A:V3 USDac [PS] |
6.87 RF S40-3 tuner stuck, rf3 circulator PSS trips
#129
09/23 05:27 To 09/25 10:24 52.95 | Cur. drop to
15ma [OTH] | 5.66 recover from linac access, Par kicker problems
#132
09/25 16:04 To 09/26 08:09 16.09 | Int Dump: End of
Period | 0.01
------------------------------------------------------------------------------------------------------------------------------------
| | 0.00
#135
09/26 16:00 To 09/30 23:49
103.82 | PSS Trip [ISI] | 0.15 end of run
Additional Downtime was assessed, and accounted for
in statistics
presentations, when the MCR had to open Insertion
Device Gaps because of
problems with Input-Output Controllers (IOCs) During
the run, this occurred
once accounting for an additional .33 hours of
downtime assessed to the Controls Group.
8/26/2000
2:44
8/26/2000 3:04
0.33 Reboot of iocs11bpm