Listing of Statistics for Run1-2001 Total Amount of User Time in this interval 1528.10 Hours User periods in this interval ----------------------------- 01/17/2001 08:01 To 01/23/2001 08:01 144.00 Hours, Delivered Beam: 138.05 Hours, 11 Fault(s), 12.55 MTBF, 95.87% of Sched. Time 01/23/2001 16:00 To 01/29/2001 08:01 136.00 Hours, Delivered Beam: 122.27 Hours, 8 Fault(s), 15.28 MTBF, 89.90% of Sched. Time 01/31/2001 08:01 To 02/06/2001 08:10 144.16 Hours, Delivered Beam: 141.47 Hours, 5 Fault(s), 28.29 MTBF, 98.13% of Sched. Time 02/06/2001 16:01 To 02/12/2001 07:59 135.98 Hours, Delivered Beam: 135.26 Hours, 1 Fault(s), 135.26 MTBF, 99.47% of Sched. Time 02/14/2001 08:00 To 02/20/2001 08:01 144.01 Hours, Delivered Beam: 140.99 Hours, 2 Fault(s), 70.49 MTBF, 97.90% of Sched. Time 02/20/2001 16:00 To 02/26/2001 08:00 135.99 Hours, Delivered Beam: 134.20 Hours, 3 Fault(s), 44.73 MTBF, 98.68% of Sched. Time 02/28/2001 08:01 To 03/06/2001 08:00 143.98 Hours, Delivered Beam: 137.94 Hours, 7 Fault(s), 19.71 MTBF, 95.80% of Sched. Time 03/06/2001 16:00 To 03/12/2001 08:00 135.99 Hours, Delivered Beam: 134.44 Hours, 4 Fault(s), 33.61 MTBF, 98.86% of Sched. Time 03/14/2001 08:00 To 03/20/2001 07:59 143.98 Hours, Delivered Beam: 135.32 Hours, 4 Fault(s), 33.83 MTBF, 93.98% of Sched. Time 03/20/2001 16:00 To 03/27/2001 08:00 159.99 Hours, Delivered Beam: 152.64 Hours, 5 Fault(s), 30.53 MTBF, 95.40% of Sched. Time 03/27/2001 16:00 To 03/31/2001 23:59 103.99 Hours, Delivered Beam: 102.59 Hours, 2 Fault(s), 51.30 MTBF, 98.66% of Sched. Time Delivered Beam 1475.18 Hours Percentage of Scheduled Time 96.54 % Downtime During Period 52.89 Hours Percentage of scheduled time SR current > 10 ma 97.35 % Average Delivered Current During This Period 84.64 ma Total integrated Current During This Period 124.86 A-hr Mean Fill Duration in Period 27.83 Hours Mean Fill Duration from Poisson Fit 30.50 Hours Mean Time Between Faults (MTBF) 28.37 Hours Faults per Day of Delivered Beam 0.85 Length Downtime is associated with the end of a fill. Valid fills Beginning in this Time Interval| Reason for | of The first fill of a period will have any Fill# Start End Duration | Fill Termination | Downtime downtime before the fill on the line above. ------------------------------------------------------------------------------------------------------------------------------------ | | 0.00 # 1 01/17 08:00 To 01/17 08:38 0.64 | PS communication [DIA] | 0.31 refill # 2 01/17 08:57 To 01/17 19:59 11.04 | top-up monitor [DIA] | 0.10 .... # 3 01/17 20:05 To 01/18 06:02 9.94 | rf2 s37 cav2 IG flt [RF] | 0.52 refill # 4 01/18 06:33 To 01/18 09:18 2.77 | beam motion RTFB [DIA] | 0.47 refill, ID04 gap problem # 5 01/18 09:47 To 01/18 19:44 9.96 | Dump for P0 Error [CTL] | 1.94 S37Cavity IG faults, refill # 6 01/18 21:41 To 01/19 14:13 16.54 | S5BQ3 trip [PS] | 0.55 Refill # 8 01/19 14:47 To 01/20 07:48 17.01 | rf4 s40 IG flt [RF] | 0.29 refill # 10 01/20 08:05 To 01/21 01:51 17.77 | S24,25 Raw Trans OT [PS] | 0.36 recover, refill # 12 01/21 02:13 To 01/22 01:49 23.60 | S24,25 Raw Trans OT [PS] | 0.53 recovery, refill # 15 01/22 02:21 To 01/22 19:56 17.58 | rad.mon. trip [OPS] | 0.51 refill # 17 01/22 20:26 To 01/22 23:40 3.23 | Vac. Valve close [CTL] | 0.36 refill # 18 01/23 00:02 To 01/23 08:00 7.97 | Int Dump: End of Period | 0.00 ------------------------------------------------------------------------------------------------------------------------------------ | | 2.77 6ID BPLD fault, PSS trip, recover # 21 01/23 18:46 To 01/25 07:44 36.97 | BPLD repairs [DIA] | 2.83 BPLD repairs, rf PSS trip,rf turn on, B:ES1 prob # 24 01/25 10:33 To 01/26 19:53 33.33 | S40 IG fault [RF] | 0.26 refill # 28 01/26 20:09 To 01/27 06:21 10.20 | S27B:Q5 trip [PS] | 1.02 recurring problems with S27B:Q5 # 29 01/27 07:22 To 01/27 22:53 15.52 | 33BM EPS trip [BO] | 0.49 reset, recovery # 30 01/27 23:22 To 01/28 00:29 1.12 | 33BM EPS trip [BO] | 0.40 reset, recovery # 31 01/28 00:53 To 01/28 03:16 2.38 | 33BM EPS trip [BO] | 0.87 reset, adjust water flow, refill # 32 01/28 04:08 To 01/28 13:34 9.44 | 33BM EPS trip [BO] | 2.47 replacement of flow transductor, recovery # 33 01/28 16:03 To 01/28 22:08 6.09 | S37 IG fault [RF] | 2.62 vacuum problems, hot coupler in cav#1 # 34 01/29 00:45 To 01/29 07:59 7.24 | Int Dump: End of Period | 0.01 ------------------------------------------------------------------------------------------------------------------------------------ | | 0.00 # 35 01/31 08:00 To 01/31 09:44 1.74 | 1ID Vac Outgas [BO] | 1.07 diagnosis, srrf trips # 36 01/31 10:49 To 01/31 20:21 9.54 | SRRF 4 trip [RF] | 0.37 recovery # 38 01/31 20:44 To 01/31 21:53 1.15 | unknown beam loss [UNK] | 0.31 recovery # 39 01/31 22:11 To 02/05 11:12 109.00 | rf3 trip ??? [RF] | 0.38 refill # 49 02/05 11:34 To 02/05 19:35 8.01 | Gate Valve Closing [CTL] | 0.55 love controller swapping, 4ID gap, refill # 50 02/05 20:09 To 02/06 08:10 12.02 | Int Dump: End of Period | 0.00 ------------------------------------------------------------------------------------------------------------------------------------ | | 0.04 # 51 02/06 16:03 To 02/09 19:49 75.78 | S40 cav 1 IG fault [RF] | 0.68 rf3 trip while resetting # 59 02/09 20:30 To 02/12 07:59 59.48 | Int Dump: End of Period | 0.00 ------------------------------------------------------------------------------------------------------------------------------------ | | 0.95 1ID EPS trip, investigation, refill # 65 02/14 08:57 To 02/14 13:55 4.96 | 13ID BPLD trip [UNK] | 0.47 refill # 66 02/14 14:23 To 02/19 14:38 120.25 | ACIS rack trip [CTL] | 1.58 Investigate, RF cavity IG fault, refill # 77 02/19 16:13 To 02/20 07:59 15.78 | Int Dump: End of Period | 0.01 ------------------------------------------------------------------------------------------------------------------------------------ | | 0.00 # 78 02/20 16:00 To 02/21 01:15 9.26 | Lost IOC comm. [CTL] | 0.42 Refill # 80 02/21 01:40 To 02/24 08:29 78.81 | RF4 IG fault [RF] | 0.44 Refill # 88 02/24 08:55 To 02/24 19:48 10.88 | S32B:Q2 curr loss [PS] | 0.93 Refill # 90 02/24 20:44 To 02/26 07:59 35.26 | Int Dump: End of Period | 0.00 ------------------------------------------------------------------------------------------------------------------------------------ | | 0.00 # 93 02/28 08:00 To 03/01 07:48 23.79 | P0 timing fault [CTL] | 0.68 Low Inj. efficiency, Refill # 95 03/01 08:28 To 03/02 00:24 15.92 | S21A:Q2 lost st pnt [PS] | 0.78 rf4 trip on IG fault, 34ID gap slow in opening # 97 03/02 01:10 To 03/02 19:44 18.56 | P0 timing fault [CTL] | 0.31 refill # 99 03/02 20:02 To 03/03 07:47 11.75 | S40 cav1 IG fault [RF] | 0.33 refill #100 03/03 08:07 To 03/03 17:41 9.57 | iocrf4hvps reboot [RF] | 1.90 problems restoring rf operation (loops not locking) #101 03/03 19:35 To 03/04 17:28 21.89 | S25A:Q3 failure [PS] | 1.45 replacement of converter #103 03/04 18:56 To 03/05 09:50 14.90 | srrf PSS trip [RF] | 0.59 recovery, refill #105 03/05 10:25 To 03/06 07:59 21.56 | Int Dump: End of Period | 0.00 ------------------------------------------------------------------------------------------------------------------------------------ | | 0.01 #107 03/06 16:00 To 03/06 21:41 5.68 | RTFB trip, S13 DSP [CTL] | 0.63 Refill #109 03/06 22:19 To 03/09 19:35 69.27 | iocrf4hvps reboot [RF] | 0.28 refill #115 03/09 19:52 To 03/11 01:50 29.97 | iocsrmon reboot [CTL] | 0.37 refill #118 03/11 02:12 To 03/11 19:44 17.53 | P0 timing fault [CTL] | 0.26 refill #120 03/11 20:00 To 03/12 07:59 11.98 | Int Dump: End of Period | 0.00 ------------------------------------------------------------------------------------------------------------------------------------ | | 0.00 #121 03/14 08:00 To 03/15 10:11 26.18 | RF PSS flt at circ 1[RF] | 0.46 reset of 420 area rf systems, refill #122 03/15 10:39 To 03/17 17:25 54.78 | RF4 HVPS Trip [RF] | 0.40 refill #123 03/17 17:49 To 03/18 17:00 23.18 | RF4 ioc problem [RF] | 3.25 power supply converter swaps #124 03/18 20:15 To 03/20 03:26 31.18 | rf4 ioc problem [RF] | 4.56 troubleshoot rf4 problem, booster acis, ps swap ------------------------------------------------------------------------------------------------------------------------------------ | | 0.14 SCDU triggers left disabled #125 03/20 16:08 To 03/21 02:07 9.98 | S19A:Q2 trip [PS] | 1.69 power supply converter swap, refill #126 03/21 03:48 To 03/21 06:04 2.26 | iocs33vp reboot [CTL] | 0.99 problems restoring communications, refill #127 03/21 07:03 To 03/22 17:58 34.92 | S28A:Q5 failed [PS] | 1.13 converter swap, refill #129 03/22 19:06 To 03/23 06:25 11.31 | rf3 klyst air flow [RF] | 0.91 reset trip limit, refill #130 03/23 07:20 To 03/27 05:30 94.18 | grnd I, 35BMT [ME] | 2.48 diagnosis, investigation ------------------------------------------------------------------------------------------------------------------------------------ | | 0.06 recovery from ground fault investigation #131 03/27 16:03 To 03/28 03:16 11.22 | VM-06-VV02 closed [CTL] | 0.76 recovery #132 03/28 04:02 To 03/29 00:43 20.67 | BPLD trip/flt? [DIA] | 0.57 refill #133 03/29 01:17 To 03/31 23:59 70.70 | Int Dump: End of Period | 0.00 Top-Up Mode Statistics ---------------------- Target Current = 102.0, Range +/- 1.0, Minimum Injector Downtime = 8.0 minutes Total Scheduled Topup Time 304.0 Hours Injector Availability 97.8%