|
|
|
|
|
|
|
|
|
Final Run (2002-2) - FY 2002 Reliability Summary |
|
|
||||
|
|
|
|
|
|
|
|
Reliability Budget based on previous run budget and Group reorganization |
|
|
|
|
|
|
|
System |
Unavailability Allotment |
|
Number of Faults |
Mean Time to Beam Loss |
Faults Per |
|
|
RF |
1.00% |
|
|
200 |
0.12 |
|
|
Diagnostics |
0.20% |
|
|
800 |
0.03 |
|
|
PFS |
0.05% |
|
|
3200 |
0.01 |
|
|
Controls |
0.15% |
|
|
800 |
0.03 |
|
|
Water/ME |
0.50% |
|
|
500 |
0.05 |
|
|
Vacuum |
0.30% |
|
|
1600 |
0.02 |
|
|
S&A |
0.00% |
|
|
10000 |
0.00 |
|
|
Operations |
0.10% |
|
|
1600 |
0.02 |
|
|
OAG |
0.10% |
|
|
1600 |
0.02 |
|
|
Physics |
0.00% |
|
|
10000 |
0.00 |
|
|
ES-PS |
1.00% |
|
|
200 |
0.12 |
|
|
ES-Intlk |
0.20% |
|
|
500 |
0.05 |
|
|
Other |
0.10% |
|
|
1600 |
0.02 |
|
|
Unidentified |
0.10% |
|
|
3200 |
0.01 |
|
|
Total |
3.80% |
|
|
50.4 |
0.48 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Data for Run 2002-2 |
|
|
|
|
|
|
|
|
|
|
|
|
Last
Run (2002-2) of FY 2002 Actual |
Unavailability |
Unavailability |
Number |
Mean Time |
Faults Per |
|
|
RF |
0.18% |
3.58 |
11 |
172.9 |
0.14 |
User
Downtime Hours |
49.67 |
Diagnostics |
0.06% |
1.18 |
3 |
634.1 |
0.04 |
|
|
PFS |
0.07% |
1.35 |
1 |
1902.3 |
0.01 |
Scheduled
Hours |
1952.00 |
Controls |
0.14% |
2.70 |
6 |
317.1 |
0.08 |
|
|
Water/ME |
0.07% |
1.40 |
2 |
951.2 |
0.03 |
Delivered
Hours |
1902.34 |
Vacuum |
0.00% |
0.00 |
0 |
0.0 |
0.00 |
|
|
S&A |
0.00% |
0.00 |
0 |
0.0 |
0.00 |
User
Availability |
97.5% |
Operations |
0.08% |
1.52 |
2 |
951.2 |
0.03 |
|
|
OAG |
0.04% |
0.72 |
0 |
0.0 |
0.00 |
|
|
Physics |
0.00% |
0.00 |
0 |
0.0 |
0.00 |
|
|
ES-PS |
0.65% |
12.70 |
7 |
271.8 |
0.09 |
|
|
ES-Intlk |
0.25% |
4.93 |
2 |
951.2 |
0.03 |
|
|
Other |
0.95% |
18.55 |
8 |
237.8 |
0.10 |
|
|
Unidentified |
0.07% |
1.35 |
3 |
634.1 |
0.04 |
|
|
Total |
2.56% |
49.98 |
45 |
42.3 |
0.57 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Updated
01/10/2003 |
|