Listing of Statistics for Run3-2002 (Created Tue May 27 09:50:45 CDT 2003)
 
Total Amount of User Time in this interval 1448.95 Hours
 
User periods in this interval
-----------------------------
10/09/2002 08:00  To  10/14/2002 16:00 128.00 Hours, Delivered Beam: 125.78 Hours,  3 Fault(s),  41.93 MTBF,  98.27% of Sched. Time
10/15/2002 08:00  To  10/21/2002 08:00 144.00 Hours, Delivered Beam: 143.15 Hours,  1 Fault(s), 143.15 MTBF,  99.41% of Sched. Time
10/23/2002 08:00  To  10/29/2002 08:00 145.00 Hours, Delivered Beam: 141.89 Hours,  5 Fault(s),  28.38 MTBF,  97.86% of Sched. Time
10/29/2002 16:00  To  11/04/2002 08:00 136.00 Hours, Delivered Beam: 134.26 Hours,  4 Fault(s),  33.57 MTBF,  98.72% of Sched. Time
11/06/2002 08:00  To  11/11/2002 16:00 128.00 Hours, Delivered Beam: 127.58 Hours,  1 Fault(s), 127.58 MTBF,  99.67% of Sched. Time
11/12/2002 08:00  To  11/18/2002 08:00 144.00 Hours, Delivered Beam: 141.71 Hours,  1 Fault(s), 141.71 MTBF,  98.41% of Sched. Time
11/20/2002 08:00  To  11/27/2002 24:00 184.00 Hours, Delivered Beam: 181.79 Hours,  3 Fault(s),  60.60 MTBF,  98.80% of Sched. Time
11/29/2002 08:00  To  12/03/2002 08:00  96.00 Hours, Delivered Beam:  94.92 Hours,  1 Fault(s),  94.92 MTBF,  98.88% of Sched. Time
12/03/2002 16:00  To  12/09/2002 08:00 136.00 Hours, Delivered Beam: 135.99 Hours,  0 Fault(s), 135.99 MTBF, 100.00% of Sched. Time
12/11/2002 08:00  To  12/19/2002 24:00 208.00 Hours, Delivered Beam: 207.51 Hours,  1 Fault(s), 207.51 MTBF,  99.76% of Sched. Time
 
Delivered Beam                                  1434.59 Hours
Percentage of Scheduled Time                     99.01 %
Downtime During Period                           14.36 Hours
Percentage of scheduled time SR current > 10 ma  99.34 %
Average Delivered Current During This Period     94.94 ma
Total integrated  Current During This Period    136.20 A-hr
 
Mean Fill Duration in Period                     68.31 Hours
Mean Fill Duration from Poisson Fit              88.83 Hours
Mean Time Between Faults (MTBF)                  71.73 Hours
Faults per Day of Delivered Beam                  0.33
                                                                         Length       Downtime is associated with the end of a fill.
 Valid fills Beginning in this Time Interval|        Reason for        |   of            The first fill of a period will have any
 Fill#  Start            End       Duration |     Fill Termination     | Downtime        downtime before the fill on the line above.
                                 (min: 1.0) |                          |
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.00 
#  1  10/09 08:00  To  10/09 09:44    1.73  | turning off Pinger [OPS] |  0.25 refill
#  2  10/09 09:58  To  10/10 06:49   20.85  | S34 BPLD trip     [DIAG] |  0.27 refill 
#  4  10/10 07:06  To  10/14 14:18  103.20  | S31AV2 problem    [DIAG] |  1.70 Beam loss again [OPS], refill 
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.00 
# 15  10/15 08:00  To  10/18 10:40   74.67  | Beam instability   [OAG] |  0.84 Lost again, refill
# 17  10/18 11:30  To  10/21 07:59   68.48  | Int Dump: End of Period  |  0.00  
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.37 Lost beam due to instability [OAG]
# 19  10/23 08:22  To  10/24 08:01   23.65  | Vac Valve close    [CTL] |  0.97 BTS problem[OAG], refill
# 20  10/24 08:59  To  10/26 17:48   56.82  | Corrector19BH1 trip [PS] |  0.21 Refill 
# 21  10/26 18:00  To  10/27 10:22   17.37  | Corrector19BH1 trip [PS] |  0.14 Refill 
# 22  10/27 10:30  To  10/27 23:52   13.37  | S13A:Q5 trip        [PS] |  0.93 Converter swap, refill 
# 23  10/28 00:48  To  10/28 16:17   15.49  | RF2 crowbar trip    [RF] |  0.49 Refill 
# 24  10/28 16:47  To  10/29 07:59   15.20  | Int Dump: End of Period  |  0.00  
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.01 
# 25  10/29 16:00  To  10/31 04:29   36.49  | iocs21fb lost comm.[CTL] |  0.20 Refill
# 26  10/31 04:41  To  10/31 08:50    4.15  | Raw supply trip     [PS] |  0.35 Refill 
# 27  10/31 09:11  To  11/03 13:39   76.47  | S20B:MT lost DAC    [PS] |  0.85 Troubleshooting S20B:MT 
# 28  11/03 14:30  To  11/03 16:37    2.12  | Earth quake in AK[OTHER] |  0.34 Refill 
# 29  11/03 16:57  To  11/04 07:59   15.04  | Int Dump: End of Period  |  0.00  
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.00 
# 30  11/06 08:00  To  11/11 13:02  125.03  | 24BV1 failure       [PS] |  0.41 refill
# 32  11/11 13:27  To  11/11 15:59    2.55  | Int Dump: End of Period  |  0.00  
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.00 
# 33  11/12 08:00  To  11/13 07:46   23.76  | Rad.Mon.trip @inj. [OPS] |  2.29 RG-2 kicker problem [PS], refill
# 35  11/13 10:03  To  11/18 07:59  117.95  | Int Dump: End of Period  |  0.00  
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.01 
# 45  11/20 08:00  To  11/21 09:59   25.98  | IK3 Dac error    [OTHER] |  0.30 Refill [PS]
# 46  11/21 10:17  To  11/22 09:44   23.46  | 2ID PSS trip        [ES] |  0.99 2 more beam losses after inj.[UKN], refill 
# 48  11/22 10:44  To  11/23 11:01   24.29  | S39A:Q4 trip        [PS] |  0.91 Converter swap, refill 
# 49  11/23 11:56  To  11/27 23:59  108.06  | Int Dump: End of Period  |  0.00  
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.00 
# 50  11/29 08:00  To  11/30 16:14   32.23  | RF2 HVPS trip       [RF] |  1.07 Trip again, refill
# 51  11/30 17:18  To  12/03 07:59   62.69  | Int Dump: End of Period  |  0.00  
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.00 
# 52  12/03 16:00  To  12/09 07:59  135.99  | Int Dump: End of Period  |  0.00 
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.15 Beam loss due to closing RTFB loop [OPS]
# 55  12/11 08:08  To  12/18 14:04  173.93  | Power supply        [PS] |  0.34 Refill
# 70  12/18 14:25  To  12/19 23:59   33.58  | Int Dump: End of Period  |  0.00  

Top-Up Mode Statistics
----------------------
Target Current = 102.0, Range +/- 2.0, Minimum Injector Downtime = 8.0 minutes

Total
  Scheduled Topup Time                          969.0 Hours
  Injector Availability                          99.3%