Listing of Statistics for Run3-2003 (Created Thu Feb 05 22:07:58 CST 2004)

 

Total Amount of User Time in this interval 1666.0 Hours

 

User periods in this interval

-----------------------------

10/01/2003 08:00  To  10/06/2003 16:00 128.00 Hours, Delivered Beam: 119.43 Hours,  7 Fault(s),  17.06 MTBF,  93.31% of Sched. Time

10/07/2003 08:00  To  10/13/2003 08:00 144.00 Hours, Delivered Beam: 140.92 Hours,  3 Fault(s),  46.97 MTBF,  97.86% of Sched. Time

10/15/2003 08:00  To  10/21/2003 08:00 144.00 Hours, Delivered Beam: 142.27 Hours,  2 Fault(s),  71.13 MTBF,  98.80% of Sched. Time

10/21/2003 16:00  To  10/27/2003 08:00 137.00 Hours, Delivered Beam: 135.12 Hours,  1 Fault(s), 135.12 MTBF,  98.63% of Sched. Time

10/29/2003 08:00  To  11/03/2003 16:00 128.00 Hours, Delivered Beam: 127.57 Hours,  1 Fault(s), 127.57 MTBF,  99.66% of Sched. Time

11/04/2003 08:00  To  11/10/2003 09:00 145.00 Hours, Delivered Beam: 128.11 Hours,  4 Fault(s),  32.03 MTBF,  88.35% of Sched. Time

11/12/2003 08:00  To  11/18/2003 08:00 144.00 Hours, Delivered Beam: 142.24 Hours,  3 Fault(s),  47.41 MTBF,  98.78% of Sched. Time

11/18/2003 16:00  To  11/25/2003 08:00 160.00 Hours, Delivered Beam: 155.58 Hours,  2 Fault(s),  77.79 MTBF,  97.24% of Sched. Time

11/25/2003 16:00  To  11/26/2003 24:00  32.00 Hours, Delivered Beam:  31.99 Hours,  0 Fault(s),  31.99 MTBF,  99.98% of Sched. Time

11/28/2003 08:00  To  12/02/2003 16:00 104.00 Hours, Delivered Beam: 103.56 Hours,  1 Fault(s), 103.56 MTBF,  99.58% of Sched. Time

12/04/2003 08:00  To  12/09/2003 08:00 120.00 Hours, Delivered Beam: 118.04 Hours,  2 Fault(s),  59.02 MTBF,  98.36% of Sched. Time

12/09/2003 16:00  To  12/15/2003 16:00 144.00 Hours, Delivered Beam: 141.42 Hours,  3 Fault(s),  47.14 MTBF,  98.21% of Sched. Time

12/16/2003 08:00  To  12/21/2003 24:00 136.00 Hours, Delivered Beam: 135.99 Hours,  0 Fault(s), 135.99 MTBF, 100.00% of Sched. Time

 

Delivered Beam                                  1622.24 Hours

Percentage of Scheduled Time                     97.38 %

Downtime During Period                           43.69 Hours

Percentage of scheduled time SR current > 10 ma  98.11 %

Average Delivered Current During This Period    100.70 mA

Total integrated  Current During This Period    163.40 A-hr

 

Mean Fill Duration in Period                     54.09 Hours

Mean Fill Duration from Poisson Fit              53.26 Hours

Mean Time Between Faults (MTBF)                  55.94 Hours

Faults per Day of Delivered Beam                  0.43

Scheduled Topup Time                            1258.00 Hours

                                                                         Length       Downtime is associated with the end of a fill.

 Valid fills Beginning in this Time Interval|        Reason for        |   of            The first fill of a period will have any

 Fill#  Start            End       Duration |     Fill Termination     | Downtime        downtime before the fill on the line above.

                                 (min: 1.0) |                          |

------------------------------------------------------------------------------------------------------------------------------------

                                            |                          |  0.07 SR Orbit Correction, 4 minutes [DIAG]

#  1  10/01 08:03  To  10/01 11:40    3.61  | Operator error .5  [OPS] |  3.18 PS 1.27 DIA.45 OAG.96-Beam loss

#  3  10/01 14:50  To  10/02 17:48   26.96  | S23 RTFB IOC error [CTL] |  0.52 Beam lost during recovery process - refill peformed

#  6  10/02 18:19  To  10/02 22:04    3.75  | S9 EPS Trip         [SI] |  1.91 Beam restored, S9 EPS Trip again, fill restored

#  8  10/02 23:59  To  10/03 15:21   15.38  | SR-RF3 Off     [Unknown] |  0.32 RF restored,  beam restored

#  9  10/03 15:40  To  10/04 04:28   12.79  | S9 EPS Trip         [SI] |  1.09 Fault cleared, beam restored

# 11  10/04 05:34  To  10/05 11:40   30.11  | Water pump failure  [ME] |  0.88 Switched to back-up pump, beam restored

# 14  10/05 12:33  To  10/05 22:03    9.50  | S9 EPS Trip         [SI] |  0.61 Trip reset, beam restored

# 16  10/05 22:39  To  10/06 15:59   17.34  | Int Dump: End of Period  |  0.00 

------------------------------------------------------------------------------------------------------------------------------------

                                            |                          |  0.00

# 18  10/07 08:00  To  10/07 11:38    3.64  | S9 EPS Trip         [SI] |  2.38 Repaired EPS system, refill, top-up ongoing

# 19  10/07 14:01  To  10/08 08:34   18.55  | Power bump/ComEd [Other] |  0.45 Bump induced SR-RF4 power change, refill, top-up.

# 20  10/08 09:01  To  10/11 08:36   71.59  | S16:BH1 Glitch      [PS] |  0.24 BPLD trip due to beam motion,refill, resume top-up

# 21  10/11 08:51  To  10/13 08:00   47.14  | Int Dump: End of Period  | -0.00 

------------------------------------------------------------------------------------------------------------------------------------

                                            |                          |  0.00

# 25  10/15 08:00  To  10/16 00:23   16.38  | Vac. Valve Closure [CTL] |  0.51 Valve opened, refill, resume top-up

# 26  10/16 00:53  To  10/18 22:53   69.59  | IOCS25FB .9       [DIAG] |  1.22 refill, beam lost OAG .32 , refill, resume top-up

 * Interruption of delivered beam between 10/16 02:25  To  10/16 02:49 Gaps not returned to user values

# 27  10/18 23:42  To  10/21 07:59   56.29  | Int Dump: End of Period  |  0.00 

------------------------------------------------------------------------------------------------------------------------------------

                                            |                          |  0.00

# 29  10/21 16:00  To  10/23 13:48   45.80  | S18/19Raw trip 1.06 [PS] |  1.87 Repair, MPS problem .81 [CTL], refill

# 30  10/23 15:40  To  10/27 07:59   89.32  | Int Dump: End of Period  |  0.00 

------------------------------------------------------------------------------------------------------------------------------------

                                            |                          |  0.00

# 31  10/29 08:00  To  10/31 04:25   44.41  | SR valve closure   [CTL] |  0.43 VM-04-VV01 re-opened, ring filled, resumed top-up

# 32  10/31 04:50  To  11/03 15:59   83.15  | Int Dump: End of Period  |  0.00 

------------------------------------------------------------------------------------------------------------------------------------

                                            |                          |  0.00

# 33  11/04 08:00  To  11/04 16:23    8.40  | PEM Steering Error [OAG] |  0.29 Refill, resume top-up

# 34  11/04 16:41  To  11/08 23:55  103.23  | SR-RF4 Trip         [RF] |  0.33 Power monitor trip, reset, refill, resume top-up

# 35  11/09 00:15  To  11/09 01:34    1.32  | UPS Fault           [IT] |  9.73 recovery of systems, refill, resume top-up

# 36  11/09 11:18  To  11/10 00:09   12.85  | UPS Fault           [IT] |  6.53 UPS by-passed, recovery, refill, resume top-up

# 37  11/10 06:41  To  11/10 08:59    2.31  | Int Dump: End of Period  |  0.00 

------------------------------------------------------------------------------------------------------------------------------------

                                            |                          |  0.01

# 39  11/12 08:00  To  11/12 23:15   15.24  | IOCS25FB Hung Task [DIA] |  0.40 Beam lost during reboot, refilled SR

# 41  11/12 23:38  To  11/13 22:17   22.64  | SR Gate Valve      [CTL] |  0.40 SR Gate Valve VM:02:VV02 closed, refill

# 44  11/13 22:40  To  11/17 13:09   86.48  | 22ID EPS trip       [SI] |  0.96 Recover from EPS trip, refill

# 52  11/17 14:07  To  11/18 07:59   17.88  | Int Dump: End of Period  |  0.00 

------------------------------------------------------------------------------------------------------------------------------------

                                            |                          |  0.00

# 54  11/18 16:00  To  11/24 06:57  134.95  | UPS AC breaker trip [IT] |  3.74 Recover,RTFB problem 0.3h [Diag],refill

# 55  11/24 10:41  To  11/24 14:37    3.93  | S32/33 Raw PS Trip  [ES] |  0.68 Reset, conditioning, refill

# 56  11/24 15:18  To  11/25 07:59   16.69  | Int Dump: End of Period  |  0.00 

------------------------------------------------------------------------------------------------------------------------------------

                                            |                          |  0.01

# 57  11/25 16:00  To  11/26 23:59   31.99  | Int Dump: End of Period  |  0.00

------------------------------------------------------------------------------------------------------------------------------------

                                            |                          |  0.00

# 58  11/28 08:00  To  11/29 04:04   20.07  | SR-RF4 pwr mon trip [RF] |  0.43 Reset RF system, refill, resume top-up

# 59  11/29 04:30  To  12/02 15:59   83.49  | Int Dump: End of Period  |  0.00 

------------------------------------------------------------------------------------------------------------------------------------

                                            |                          |  0.00

# 64  12/04 08:00  To  12/05 12:21   28.35  | BPLD Trip      [Unknown] |  0.46 Still under investigation, refill, resume top-up

# 65  12/05 12:48  To  12/09 06:30   89.69  | S22 supplies trip   [PS] |  1.50 Recover, refill, user period ends

------------------------------------------------------------------------------------------------------------------------------------

                                            |                          |  0.01

# 67  12/09 16:00  To  12/09 22:34    6.57  | Rad.Mon. fault     [UES] |  0.59 Investigation, refill, resume top-up

# 68  12/09 23:09  To  12/11 21:34   46.41  | 34ID PSS trip       [SI] |  0.70 Reset, investigate, refill

# 69  12/11 22:16  To  12/13 05:19   31.06  | S17BQ4 PS fault     [PS] |  1.29 Supply swap, refill

# 70  12/13 06:36  To  12/15 15:59   57.38  | Int Dump: End of Period  |  0.00 

------------------------------------------------------------------------------------------------------------------------------------

                                            |                          |  0.00

# 72  12/16 08:00  To  12/21 23:59  135.99  | Int Dump: End of Period  |  0.00

 

Top-Up Mode Statistics

----------------------

Target Current Range +/- 2.0, Minimum Injector Downtime = 8.0 minutes

 

Total

  Current in Range during Scheduled Topup Time   95.16 %

  Current in Range during Delivered Beam Time    97.72 %

  Injector Availability                          97.59 %