Run Statistics by Week in FY2004
                             
                             
Faults                            
Week 1 2 3 4 5 6 7 8 9 10 11 12 13 Sum
                             
Run 03-3 7 3 2 1 1 4 3 2 0 1 2 3 0 29
Run 04-1 2 1 3 3 2 2 2 1 3 2 6 1   28
Run 04-2 7 4 1 1 2 1 3 3 3 2 0 1 4 32
                             
                            89
MTBF                            
Week 1 2 3 4 5 6 7 8 9 10 11 12 13 Total
                             
Run 03-3 17.1 47.0 71.1 135.1 127.6 32.0 47.4 77.8 32 103.6 59.0 47.1 136 55.94
Run 04-1 50.8 143.6 47.0 44.7 56.4 71.4 71.2 135.7 46.6 66.8 20.7 158.5   57.50
Run 04-2 20.6 36.0 144.0 136.0 64.0 120.0 64.0 45.3 42.7 72.0 144 168.0 46.0 58.75
                             
Average 29.5 75.5 87.4 105.3 82.6 74.5 60.9 86.3 40.4 62.5 32.2 124.5 91.0 57.4
                             
                             
Availability                            
Week 1 2 3 4 5 6 7 8 9 10 11 12 13 Total
                             
Run 03-3 93.3% 97.9% 98.8% 98.6% 99.7% 88.4% 98.8% 97.2% 100.0% 99.6% 98.4% 98.2% 100.0% 97.38%
Run 04-1 97.7% 99.7% 98.0% 98.5% 86.5% 99.1% 98.9% 99.8% 96.9% 99.0% 97.0% 99.1%   97.76%
Run 04-2 97.1% 97.0% 99.0% 99.9% 96.0% 99.9% 99.0% 99.0% 96.0% 98.0% 100.0% 99.0% 97.0% 98.34%
                             
Average 96.0% 98.2% 98.6% 99.0% 94.0% 95.8% 98.9% 98.7% 97.6% 98.9% 98.4% 98.8% 98.5% 97.8%
Yellow shaded areas indicated weeks in which operational goals of 95% availability and/or 50 hours MTBF were met
Statistics through 8/26/04