Default Storage Ring Refill Time 0.25       Refill Timing in Days 0.010417
Downtime for Run 2005-2
Fill # Start End Length Loss
Reason
DIN # Audit Start End User
Length
System
Length
Cause System Group Type Description Store Lost Intention. Dump Inhibits Beam TOTAL
1 06/01/05 08:00 06/01/05 15:52 7.87 S19 DPBLD Trip (Unknown) 104937   06/01/05 15:52 06/01/05 16:12 0.33 0.33 UNK UNK UNK Store Lost Still under investigation 1     1
2 06/01/05 16:12 06/01/05 23:59 7.78 SR-RF4 Trip         (RF) 104938   06/01/05 23:59 06/02/05 00:27 0.47 0.47 RF RF RF Store Lost RF4 trip on S40 vacuum, restored RF, refill.  1     1  
3 06/02/05 00:27 06/05/05 01:45 73.30 SR PS GESPAC        [PS] 104939   06/05/05 01:45 06/05/05 02:39 0.90 0.90 PS PS PS Intentional Dump Intentional dump to replace GESPAC PS, refill.  1     1
4 06/05/05 02:39 06/06/05 08:00 29.35 Int Dump: End of Period             Scheduled           1   1  
      118.30           1.70 1.70                 0
      0.00   104944   06/07/05 08:00 06/07/05 08:21 0.35 0.35 ME ME ME Inhibits beam to User S19 MPS Trip Delayed User Operations (ME)     1  
5 06/07/05 08:21 06/08/05 03:30 19.15 S5 MPS Trip         [ME] 104946   06/08/05 03:30 06/08/05 04:44 1.23 1.23 ME ME ME Store Lost H20 flow trip, S5 love controller replaced. 1     1  
6 06/08/05 04:44 06/11/05 19:17 86.55 SR-RF2 Trip         [RF] 104948   06/11/05 19:17 06/12/05 01:39 6.37 6.37 RF RF RF Store Lost UVC Display Failure, switch problems, etc.  1     1
7 06/12/05 01:39 06/13/05 19:30 41.85 20-ID DPBLD Trip [Unkwn] 104949   06/13/05 19:30 06/13/05 20:02 0.53 0.53 UNK UNK UNK Store Lost Under investigation, refill, resume top-up.  1     1  
8 06/13/05 20:02 06/14/05 00:00 3.97 Int Dump: End of Period             Scheduled           1   1  
      151.52           8.48 8.48                 0
9 06/14/05 08:00 06/14/05 20:52 12.87 RF5 PSS Trip       [OPS] 104950   06/14/05 20:52 06/14/05 21:38 0.77 0.77 OPS RF OPS Store Lost Cell phone generated the RF PSS trip, refill. 1     1  
10 06/14/05 21:38 06/20/05 08:00 130.37 Int Dump: End of Period             Scheduled           1   1  
      143.23           0.77 0.77                 0
        Orbit Recovery Delayed due to Human Error      [OPS]     06/21/05 08:00 06/21/05 09:00 1.00 1.00 OPS PS OPS Inhibits beam to User       1 1
11 06/21/05 09:00 06/27/05 08:46 143.77 S28 MPS Trip        [ME] 104959   06/27/05 08:46 06/27/05 09:21 0.58 0.58 ME ME ME Store Lost   1     1  
12 06/27/05 09:21 06/28/05 00:10 14.82 Int Dump: End of Period             Scheduled           1   1  
      158.58           1.58 1.58                 0
          104960   06/28/05 08:00 06/28/05 09:59 1.98 1.98 ME ME ME Inhibits beam to User Access for Booster water leak.       1 1
13 06/28/05 09:59 07/04/05 07:59 142.00 Int Dump: End of Period             Scheduled           1   1  
      142.00           1.98 1.98                 0
14 07/06/05 08:01 07/10/05 01:03 89.03 SR-RF4              [RF] 104967   07/10/05 01:03 07/10/05 01:25 0.37 0.37 RF RF RF Store Lost SR-RF4 gap voltage drop out, reset, refill. 1     1
15 07/10/05 01:25 07/11/05 05:59 28.57 S21A:S4 Trip        [PS] 104968   07/11/05 05:59 07/11/05 06:54 0.92 0.92 PS PS PS Store Lost S21A:S4 trip, swapped out supply, refill. 1     1  
16 07/11/05 06:54 07/11/05 16:00 9.10 Int Dump: End of Period             Scheduled           1   1  
      126.70           1.28 1.28                 0
17 07/12/05 08:00 07/16/05 05:35 93.58 S10 DPBLD           [PS] 104972   07/16/05 05:35 07/16/05 05:57 0.37 0.37 PS PS PS Store Lost S29B:H1 suspect, supply swapped, will monitor. 1     1  
18 07/16/05 05:57 07/16/05 19:34 13.62 S10 DPBLD           [PS] 104974   07/16/05 19:34 07/16/05 19:58 0.40 0.40 PS PS PS Store Lost Suspect S29B:H1 as cause, supply swapped.  1     1
19 07/16/05 19:58 07/18/05 00:29 28.52 S10 DPBLD           [PS] 104978   07/18/05 00:29 07/18/05 00:43 0.23 0.23 PS PS PS Store Lost S29B:H1 suspect, supply has been swapped out.  1     1  
20 07/18/05 00:43 07/18/05 03:07 2.40 SR-RF4 Trip         [RF] 104979   07/18/05 03:07 07/18/05 03:27 0.33 0.33 RF RF RF Store Lost LLRF detector trip, reset, refill, resume top-up.  1     1
21 07/18/05 03:27 07/18/05 08:00 4.55 Int Dump: End of Period             Scheduled           1   1  
      142.67           1.33 1.33                 0
22 07/20/05 08:00 07/22/05 00:33 40.55 Unknown Beam Motion  [?]     07/22/05 00:33 07/22/05 00:52 0.32 0.32 UNK UNK UNK Store Lost   1     1  
23 07/22/05 00:52 07/26/05 00:00 95.13 Int Dump: End of Period         0.00 0.00 Scheduled           1   1  
      135.68           0.32 0.32                 0
24 07/26/05 08:00 07/26/05 13:34 5.57 Unknown Beam Motion  [?]     07/26/05 13:34 07/26/05 14:04 0.50 0.50 UNK UNK UNK Store Lost   1     1  
25 07/26/05 14:04 08/01/05 08:00 137.93 Int Dump: End of Period         0.00 0.00 Scheduled           1   1  
      143.50           0.50 0.50                 0
26 08/03/05 08:00 08/08/05 16:00 128.00 Int Dump: End of Period             Scheduled           1   1  
      128.00           0.00 0.00                 0
27 08/09/05 08:00 08/11/05 21:43 61.72 S15 EPS Trip        [SI]     08/11/05 21:43 08/12/05 01:57 4.23 4.23 SI SI SI Store Lost Love Controller was replaced, beam restored. 1     1
28 08/12/05 01:57 08/15/05 08:26 78.48 S11 FE-EPS         [XFD]     08/15/05 08:26 08/15/05 10:36 2.17 2.17 XFD XFD XFD Store Lost Low flow for BPM1, possible restriction.  1     1  
29 08/15/05 10:36 08/15/05 16:00 5.40 Int Dump: End of Period             Scheduled           1   1  
      145.60           6.40 6.40                 0
30 08/16/05 08:00 08/18/05 15:25 55.42 S23B:Q5 trip        [PS]     08/18/05 15:25 08/18/05 17:08 1.72 1.72 PS PS PS Store Lost Quad power supply was swapped, refill. 1     1
31 08/18/05 17:08 08/19/05 16:54 23.77 S11B:Q2 PS trip     [PS]      08/19/05 16:54 08/19/05 18:11 1.28 1.28 PS PS PS Store Lost Quad power supply was swapped, refill. 1     1  
32 08/19/05 18:11 08/26/05 00:00 149.82 Int Dump: End of Period             Scheduled           1   1  
      229.00           3.00 3.00                 0
 
Number of Lost Fills 20 Downtime
Number of Intentional Dumps 12 User System
Number of Fills 32 27.35 27.35 20 12 3 35
SL Scheduled Inhibits
Total User Beam 1764.78 73.5 User Beam days
Total User Downtime 27.35 <-- This downtime includes Gaps Open
Total Schedule Run Length 1792.13
32
Mean Time Between Faults 88.24
Faults/Day of Delivered Beam 0.27 #REF!
X-ray Availability 98.5% #REF!
     
                 
     
                 
     
                 
     
                       
                 
     
                 
2