Group              
Data PS RF UNK XFD ME OPS SI Grand Total
Sum of Inhibits Beam 0 0 0 0 2 1 0 3
Sum of Intention. Dump 0 0 0 0 0 0 0 0
Sum of Store Lost 7 4 4 1 2 1 1 20
Sum of System
Length
5.82 7.53 1.68 2.17 4.15 1.77 4.23 27.35
RF Diag PS Controls Accelerator Intlks Beamline Intlks Radiation Intlks Water/ME Vacuum Operations Software Physics ID-FE Electrical-APS Electrical-ANL Cooling-ANL Other Unidentified Grand Total Total Hours
Run 2005-2 0.4% 0.3% 0.2% 0.2% 0.1% 0.1% 0.1% 1.5%
Budget 0.90% 0.20% 0.90% 0.50% 0.10% 0.10% 0.10% 0.30% 0.30% 0.10% 0.10% 0.00% 0.10% 0.10% 0.30% 0.10% 0.30% 0.10% 4.60%
Faults  4 7 1 2 1 1 4 20.00
RF Diag PS Controls Accelerator Intlks Beamline Intlks Radiation Intlks Water/ME Vacuum Operations Software Physics ID-FE Electrical-APS Electrical-ANL Cooling-ANL Other Unidentified
Run 2005-2 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0.0 0.0 0.0 0.1 0.3
Budget 0.12 0.03 0.10 0.05 0.01 0.01 0.02 0.05 0.01 0.02 0.02 0.00 0.01 0.01 0.01 0.01 0.02 0.02 0.52
Total User Beam 1764.78
Total Schedule Run Length 1792.13