Listing of Statistics for Run3-2009 (Created Wed Dec 23 14:17:39 CST 2009)
 
Total Amount of User Time in this interval 1552.95 Hours
 
User periods in this interval
-----------------------------
10/06/2009 08:00  To  10/13/2009 08:00 168.00 Hours, Delivered Beam: 159.72 Hours,  6 Fault(s),  26.62 MTBF,  95.07% of Sched. Time
10/14/2009 08:00  To  10/19/2009 08:00 120.00 Hours, Delivered Beam: 113.32 Hours,  2 Fault(s),  56.66 MTBF,  94.44% of Sched. Time
10/21/2009 08:00  To  10/27/2009 08:00 144.00 Hours, Delivered Beam: 144.00 Hours,  0 Fault(s), 144.00 MTBF, 100.00% of Sched. Time
10/28/2009 08:00  To  11/03/2009 08:00 145.00 Hours, Delivered Beam: 144.53 Hours,  1 Fault(s), 144.53 MTBF,  99.67% of Sched. Time
11/04/2009 08:00  To  11/10/2009 08:00 144.00 Hours, Delivered Beam: 144.00 Hours,  0 Fault(s), 144.00 MTBF, 100.00% of Sched. Time
11/11/2009 08:00  To  11/16/2009 08:00 120.00 Hours, Delivered Beam: 119.49 Hours,  1 Fault(s), 119.49 MTBF,  99.58% of Sched. Time
11/18/2009 08:00  To  11/25/2009 24:00 184.00 Hours, Delivered Beam: 182.70 Hours,  1 Fault(s), 182.70 MTBF,  99.30% of Sched. Time
11/27/2009 08:00  To  12/01/2009 08:00  96.00 Hours, Delivered Beam:  95.99 Hours,  0 Fault(s),  95.99 MTBF,  99.99% of Sched. Time
12/02/2009 08:00  To  12/08/2009 08:00 144.00 Hours, Delivered Beam: 144.00 Hours,  0 Fault(s), 144.00 MTBF, 100.00% of Sched. Time
12/09/2009 08:00  To  12/15/2009 08:00 144.00 Hours, Delivered Beam: 144.00 Hours,  0 Fault(s), 144.00 MTBF, 100.00% of Sched. Time
12/16/2009 08:00  To  12/22/2009 08:00 144.00 Hours, Delivered Beam: 144.00 Hours,  0 Fault(s), 144.00 MTBF, 100.00% of Sched. Time
 
Delivered Beam                                  1535.74 Hours
Percentage of Scheduled Time                     98.89 %
Downtime During Period                           17.21 Hours
Percentage of scheduled time SR current > 10 ma  99.45 %
Average Delivered Current During This Period    100.58 mA
Total integrated  Current During This Period    154.46 A-hr
 
Mean Fill Duration in Period                    127.98 Hours
Mean Fill Duration from Poisson Fit             171.37 Hours
Mean Time Between Faults (MTBF)                 139.61 Hours
Faults per Day of Delivered Beam                  0.17
Total Number of Faults                           11
Scheduled Topup Time                            1289.00 Hours
                                                                         Length       Downtime is associated with the end of a fill.
 Valid fills Beginning in this Time Interval|        Reason for        |   of            The first fill of a period will have any
 Fill#  Start            End       Duration |     Fill Termination     | Downtime        downtime before the fill on the line above.
                                 (min: 1.0) |                          |
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.00 
#  1  10/06 08:00  To  10/06 13:18    5.31  | CU steering failure[PS]  |  0.70 Investigation and refill
#  2  10/06 14:00  To  10/06 16:56    2.92  | RF4 HVPS trip [RF]       |  0.44 Investigation, refill 
#  3  10/06 17:22  To  10/06 19:27    2.08  | PS DAC error [CTL]       |  5.10 2nd beam loss,IOCS37BPM failed[CTL] 
#  5  10/07 00:33  To  10/08 15:46   39.23  | CPU AFG malfunction[CTL] |  0.38 Investigation, refill 
#  6  10/08 16:09  To  10/09 14:59   22.82  | S26B:Q5:PS glitch [PS]   |  1.29 Investigtion, swap-out supply, refill 
#  7  10/09 16:16  To  10/10 06:04   13.79  | RF4 Mod Anode trip[RF]   |  0.36 Investigation, refill 
#  8  10/10 06:25  To  10/13 07:59   73.57  | Int Dump: End of Period  |  0.00  
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.00 
#  9  10/14 08:00  To  10/16 00:01   40.03  | RF3 comm.problems [CTL]  |  0.54 Investigation, refill
# 10  10/16 00:33  To  10/19 01:51   73.30  | RF3 HVPS problem [RF]    |  6.14 Investigation, waveguide switch 
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.00 
# 14  10/21 08:00  To  10/27 07:59  144.00  | Int Dump: End of Period  |  0.00 
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.00 
# 15  10/28 08:00  To  11/02 09:50  122.83  | 420RF-PSS trip [RF]      |  0.47 Investigation, refill
# 16  11/02 10:18  To  11/03 07:59   21.70  | Int Dump: End of Period  |  0.00  
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.00 
# 17  11/04 08:00  To  11/10 07:59  144.00  | Int Dump: End of Period  |  0.00 
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.00 
# 18  11/11 08:00  To  11/13 07:13   47.23  | S6B:P4 BPM failure[DIAG] |  0.50 Investigation, refill
# 19  11/13 07:44  To  11/16 08:00   72.26  | Int Dump: End of Period  |  0.00  
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.00 
# 20  11/18 08:00  To  11/24 01:52  137.88  | S12 Sextupole trip [PS]  |  1.29 Swapped supply, conditioned, refilled 
# 21  11/24 03:10  To  11/25 23:59   44.83  | Int Dump: End of Period  |  0.00  
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.00 
# 22  11/27 08:00  To  12/01 07:59   95.99  | Int Dump: End of Period  |  0.00 
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.00 
# 23  12/02 08:00  To  12/08 07:59  144.00  | Int Dump: End of Period  |  0.00 
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.00 
# 24  12/09 08:00  To  12/15 07:59  144.00  | Int Dump: End of Period  |  0.00 
------------------------------------------------------------------------------------------------------------------------------------
                                            |                          |  0.00 
# 25  12/16 08:00  To  12/22 07:59  144.00  | Int Dump: End of Period  |  0.00 

Top-Up Mode Statistics
----------------------
Target Current Range +/- 2.0, Minimum Injector Downtime = 8.0 minutes

Total
  Current in Range during Scheduled Topup Time   98.07 %
  Current in Range during Delivered Beam Time    99.36 %
  Injector Availability                          99.28 %

Period Beginning 10/06/2009 08:00
Current in Range                                100.00 %
Injector Availability                           100.00 %

Period Beginning 10/14/2009 08:00
Current in Range                                100.00 %
Injector Availability                           100.00 %

Period Beginning 10/21/2009 08:00
Current in Range                                100.00 %
Injector Availability                           100.00 %

Period Beginning 10/28/2009 08:00
Current in Range                                 99.73 %
Injector Availability                            99.65 %
  Out of Range at:     10/29/2009 20:42:00 to 10/29/2009 20:50:32 :   8.53 minutes
    Injector downtime: 10/29/2009 20:37:04 to 10/29/2009 20:50:28 :  13.40 minutes
  Out of Range at:     10/31/2009 10:24:16 to 10/31/2009 10:38:48 :  14.53 minutes
    Injector downtime: 10/31/2009 10:19:20 to 10/31/2009 10:36:40 :  17.33 minutes

Period Beginning 11/18/2009 08:00
Current in Range                                100.00 %
Injector Availability                           100.00 %

Period Beginning 11/27/2009 08:00
Current in Range                                 97.54 %
Injector Availability                            97.23 %
  Out of Range at:     11/27/2009 09:31:28 to 11/27/2009 10:30:56 :  59.47 minutes
    Injector downtime: 11/27/2009 09:26:32 to 11/27/2009 10:30:52 :  64.33 minutes
  Out of Range at:     11/28/2009 12:43:36 to 11/28/2009 14:05:44 :  82.13 minutes
    Injector downtime: 11/28/2009 12:38:40 to 11/28/2009 14:05:40 :  87.00 minutes
  Out of Range at:     11/29/2009 10:00:32 to 11/29/2009 10:00:32 :   0.00 minutes
    Injector downtime: 11/29/2009 09:52:32 to 11/29/2009 10:00:32 :   8.00 minutes (est)

Period Beginning 12/02/2009 08:00
Current in Range                                100.00 %
Injector Availability                           100.00 %

Period Beginning 12/09/2009 08:00
Current in Range                                 98.08 %
Injector Availability                            97.76 %
  Out of Range at:     12/09/2009 09:29:12 to 12/09/2009 09:43:12 :  14.00 minutes
    Injector downtime: 12/09/2009 09:24:16 to 12/09/2009 09:41:52 :  17.60 minutes
  Out of Range at:     12/09/2009 15:18:16 to 12/09/2009 15:31:04 :  12.80 minutes
    Injector downtime: 12/09/2009 15:13:20 to 12/09/2009 15:29:52 :  16.53 minutes
  Out of Range at:     12/09/2009 15:37:12 to 12/09/2009 16:25:12 :  48.00 minutes
    Injector downtime: 12/09/2009 15:32:20 to 12/09/2009 16:25:08 :  52.80 minutes
  Out of Range at:     12/10/2009 17:20:24 to 12/10/2009 17:39:12 :  18.80 minutes
    Injector downtime: 12/10/2009 17:15:28 to 12/10/2009 17:39:08 :  23.67 minutes
  Out of Range at:     12/10/2009 19:23:36 to 12/10/2009 19:30:16 :   6.67 minutes
    Injector downtime: 12/10/2009 19:15:36 to 12/10/2009 19:23:36 :   8.00 minutes (est)
  Out of Range at:     12/12/2009 17:50:56 to 12/12/2009 18:35:44 :  44.80 minutes
    Injector downtime: 12/12/2009 17:46:04 to 12/12/2009 18:35:40 :  49.60 minutes
  Out of Range at:     12/14/2009 13:07:52 to 12/14/2009 13:28:40 :  20.80 minutes
    Injector downtime: 12/14/2009 13:02:56 to 12/14/2009 13:28:36 :  25.67 minutes

Period Beginning 12/16/2009 08:00
Current in Range                                 98.20 %
Injector Availability                            98.09 %
  Out of Range at:     12/16/2009 09:26:32 to 12/16/2009 09:32:00 :   5.47 minutes
    Injector downtime: 12/16/2009 09:18:32 to 12/16/2009 09:26:32 :   8.00 minutes (est)
  Out of Range at:     12/16/2009 09:37:36 to 12/16/2009 11:27:44 : 110.13 minutes
    Injector downtime: 12/16/2009 09:32:40 to 12/16/2009 11:27:40 : 115.00 minutes
  Out of Range at:     12/16/2009 14:36:56 to 12/16/2009 15:17:04 :  40.13 minutes
    Injector downtime: 12/16/2009 14:32:00 to 12/16/2009 15:13:52 :  41.87 minutes