Listing of Statistics for Run1-2010 (Created Thu Apr 29 10:52:29 CDT 2010)
Total Amount of User Time in this interval 1726.94 Hours
User periods in this interval
-----------------------------
02/02/2010 08:00 To 02/09/2010 08:00 168.00 Hours, Delivered Beam: 165.62 Hours, 2 Fault(s), 82.81 MTBF, 98.58% of Sched. Time
02/10/2010 08:00 To 02/16/2010 08:00 144.00 Hours, Delivered Beam: 139.85 Hours, 4 Fault(s), 34.96 MTBF, 97.12% of Sched. Time
02/17/2010 08:00 To 02/23/2010 08:00 144.00 Hours, Delivered Beam: 139.69 Hours, 2 Fault(s), 69.84 MTBF, 97.01% of Sched. Time
02/24/2010 08:00 To 03/01/2010 08:00 120.00 Hours, Delivered Beam: 116.89 Hours, 2 Fault(s), 58.45 MTBF, 97.41% of Sched. Time
03/03/2010 08:00 To 03/09/2010 08:00 144.00 Hours, Delivered Beam: 143.99 Hours, 0 Fault(s), 143.99 MTBF, 100.00% of Sched. Time
03/10/2010 08:00 To 03/16/2010 08:00 143.00 Hours, Delivered Beam: 136.26 Hours, 5 Fault(s), 27.25 MTBF, 95.29% of Sched. Time
03/17/2010 08:00 To 03/23/2010 08:00 144.00 Hours, Delivered Beam: 141.71 Hours, 2 Fault(s), 70.86 MTBF, 98.41% of Sched. Time
03/24/2010 08:00 To 03/29/2010 08:00 120.00 Hours, Delivered Beam: 117.59 Hours, 2 Fault(s), 58.79 MTBF, 97.99% of Sched. Time
03/31/2010 08:00 To 04/06/2010 08:00 144.00 Hours, Delivered Beam: 140.77 Hours, 2 Fault(s), 70.38 MTBF, 97.75% of Sched. Time
04/07/2010 08:00 To 04/13/2010 08:00 144.00 Hours, Delivered Beam: 143.61 Hours, 1 Fault(s), 143.61 MTBF, 99.73% of Sched. Time
04/14/2010 08:00 To 04/20/2010 08:00 144.00 Hours, Delivered Beam: 143.51 Hours, 1 Fault(s), 143.51 MTBF, 99.66% of Sched. Time
04/21/2010 08:00 To 04/28/2010 08:00 168.00 Hours, Delivered Beam: 167.99 Hours, 0 Fault(s), 167.99 MTBF, 100.00% of Sched. Time
Delivered Beam 1697.50 Hours
Percentage of Scheduled Time 98.29 %
Downtime During Period 29.45 Hours
Percentage of scheduled time SR current > 10 ma 98.69 %
Average Delivered Current During This Period 99.55 mA
Total integrated Current During This Period 168.98 A-hr
Mean Fill Duration in Period 70.73 Hours
Mean Fill Duration from Poisson Fit 72.68 Hours
Mean Time Between Faults (MTBF) 73.80 Hours
Faults per Day of Delivered Beam 0.33
Total Number of Faults 23
Scheduled Topup Time 1295.00 Hours
Length Downtime is associated with the end of a fill.
Valid fills Beginning in this Time Interval| Reason for | of The first fill of a period will have any
Fill# Start End Duration | Fill Termination | Downtime downtime before the fill on the line above.
(min: 1.0) | |
------------------------------------------------------------------------------------------------------------------------------------
| | 0.14 Linac PLC p.s. failure, replaced, filled ring[CTL]
# 1 02/02 08:08 To 02/02 15:58 7.82 | RF2 Kly Output Arc [RF] | 0.43 Reset and refilled the ring
# 2 02/02 16:23 To 02/07 01:44 105.34 | 14BM PSS ChainB dead[SI] | 1.80 SI requested beamline offline, standardized, filled
# 3 02/07 03:32 To 02/09 08:00 52.46 | Int Dump: End of Period | 0.00
------------------------------------------------------------------------------------------------------------------------------------
| | 0.00
# 4 02/10 08:00 To 02/10 10:19 2.32 | CPU Software [CTL] | 1.61 2nd loss, investigation, refill
# 6 02/10 11:55 To 02/11 21:01 33.10 | RF2 Kly Output Arc [RF] | 0.30 Investigation, refill
# 7 02/11 21:19 To 02/13 02:01 28.70 | RF4 Kly Output Arc [RF] | 0.36 Investigation, refill
# 8 02/13 02:23 To 02/16 06:07 75.74 | PW pump brkr failed[FMS] | 1.87
------------------------------------------------------------------------------------------------------------------------------------
| | 0.00
# 9 02/17 08:00 To 02/19 14:14 54.24 | 10ID PSS ChainB fail[SI] | 0.81 Took 10-ID offline, standardized, refilled
# 10 02/19 15:03 To 02/22 22:00 78.95 | 35 BPM IOC PS fail[CTL] | 3.49 Replaced IOC P.S., troubleshoot BPM problem [CTL]
# 11 02/23 01:29 To 02/23 07:59 6.50 | Int Dump: End of Period | 0.00
------------------------------------------------------------------------------------------------------------------------------------
| | 0.00
# 12 02/24 08:00 To 02/28 05:59 93.98 | LTP BESOCM SR<50mA[DIA] | 0.51 BESOCM adjusted,[.33hr DIAG],human error[.18hr AOP]
# 13 02/28 06:29 To 03/01 05:24 22.91 | S39A:Q1:PS trip [PS] | 2.59 Swapped 2 supplies, conditioned ring, refill
------------------------------------------------------------------------------------------------------------------------------------
| | 0.00
# 15 03/03 08:00 To 03/09 07:59 143.99 | Int Dump: End of Period | 0.00
------------------------------------------------------------------------------------------------------------------------------------
| | 0.00
# 16 03/10 08:00 To 03/10 16:40 8.67 | RF3 Kly Out Cav Arc[RF] | 0.80 Investigation, refill
# 17 03/10 17:28 To 03/11 01:02 7.57 | S1A:V4 P.S. trip [PS] | 1.73 Swapped supply, conditioned ring
# 18 03/11 02:46 To 03/11 07:15 4.47 | 12BM PSS trip [SI] | 0.80 Beamline taken offline, conditioned, refilled.
# 19 03/11 08:03 To 03/15 05:33 92.51 | RF4 Mod Anode fail [RF] | 3.07 Second loss, WG switch error;2.0hr[RF],1.1hr[AOP]
# 21 03/15 08:37 To 03/15 19:40 11.03 | RF1 Kly Out Arc [RF] | 0.32 Investigated, refill
# 22 03/15 19:59 To 03/16 07:59 12.01 | Int Dump: End of Period | 0.00
------------------------------------------------------------------------------------------------------------------------------------
| | 0.00
# 23 03/17 08:00 To 03/20 04:19 68.32 | 14-ID PSS trip [SI] | 1.27 Investigation, recoverd sytems, refilled [SI]
# 24 03/20 05:35 To 03/20 19:50 14.25 | Power bump/dip [OTH] | 1.02 Recovered systems, refilled
# 25 03/20 20:51 To 03/23 07:59 59.14 | Int Dump: End of Period | 0.00
------------------------------------------------------------------------------------------------------------------------------------
| | 0.00
# 26 03/24 08:00 To 03/25 17:26 33.44 | S26B:Q2:PS failure [PS] | 1.96 P.S. swap-out, Conditioned double sector, refille
# 27 03/25 19:24 To 03/28 10:40 63.27 | RF4 Kly Out Arc [RF] | 0.44 Recover injectors, refill
# 28 03/28 11:07 To 03/29 07:59 20.88 | Int Dump: End of Period | 0.00
------------------------------------------------------------------------------------------------------------------------------------
| | 0.00
# 29 03/31 08:00 To 04/01 05:48 21.81 | S20A:S1:PS trip [PS] | 1.90 3 PS swapped due to water leak, conditioned
# 30 04/01 07:42 To 04/03 15:41 55.99 | IOCRFsource reboot[CTL] | 1.33 Recovered systems, refilled.
# 31 04/03 17:01 To 04/06 07:59 62.97 | Int Dump: End of Period | 0.00
------------------------------------------------------------------------------------------------------------------------------------
| | 0.00
# 32 04/07 08:00 To 04/08 01:54 17.91 | RF4 Kly Out Arc [RF] | 0.38 Investigation, refill
# 33 04/08 02:17 To 04/13 07:59 125.71 | Int Dump: End of Period | 0.00
------------------------------------------------------------------------------------------------------------------------------------
| | 0.00
# 34 04/14 08:00 To 04/14 14:45 6.76 | RF IOC Comm loss [??] | 0.48 Investigation and refill
# 35 04/14 15:14 To 04/20 07:59 136.76 | Int Dump: End of Period | 0.00
------------------------------------------------------------------------------------------------------------------------------------
| | 0.00
# 36 04/21 08:00 To 04/28 07:59 167.99 | Int Dump: End of Period | 0.00
Top-Up Mode Statistics
----------------------
Target Current Range +/- 2.0, Minimum Injector Downtime = 8.0 minutes
Total
Current in Range during Scheduled Topup Time 96.36 %
Current in Range during Delivered Beam Time 98.24 %
Injector Availability 98.15 %
Period Beginning 02/02/2010 08:00
Current in Range 99.47 %
Injector Availability 99.37 %
Out of Range at: 02/03/2010 23:37:12 to 02/03/2010 23:50:16 : 13.07 minutes
Injector downtime: 02/03/2010 23:32:16 to 02/03/2010 23:48:08 : 15.87 minutes
Out of Range at: 02/04/2010 12:49:44 to 02/04/2010 13:19:12 : 29.47 minutes
Injector downtime: 02/04/2010 12:44:48 to 02/04/2010 13:16:56 : 32.13 minutes
Out of Range at: 02/08/2010 07:50:40 to 02/08/2010 08:00:24 : 9.73 minutes
Injector downtime: 02/08/2010 07:45:44 to 02/08/2010 08:00:20 : 14.60 minutes
Period Beginning 02/10/2010 08:00
Current in Range 99.95 %
Injector Availability 99.90 %
Out of Range at: 02/13/2010 07:22:48 to 02/13/2010 07:26:40 : 3.87 minutes
Injector downtime: 02/13/2010 07:14:48 to 02/13/2010 07:22:48 : 8.00 minutes (est)
Period Beginning 02/17/2010 08:00
Current in Range 98.56 %
Injector Availability 98.50 %
Out of Range at: 02/22/2010 13:35:52 to 02/22/2010 15:36:40 : 120.80 minutes
Injector downtime: 02/22/2010 13:30:56 to 02/22/2010 15:36:36 : 125.67 minutes
Period Beginning 02/24/2010 08:00
Current in Range 94.25 %
Injector Availability 94.19 %
Out of Range at: 02/25/2010 00:24:40 to 02/25/2010 00:36:48 : 12.13 minutes
Injector downtime: 02/25/2010 00:16:40 to 02/25/2010 00:24:40 : 8.00 minutes (est)
Out of Range at: 02/27/2010 23:48:48 to 02/28/2010 05:58:56 : 370.13 minutes
Injector downtime: 02/27/2010 23:43:52 to 02/28/2010 05:58:52 : 375.00 minutes
Out of Range at: 02/28/2010 06:29:52 to 02/28/2010 06:50:40 : 20.80 minutes
Injector downtime: 02/28/2010 06:24:56 to 02/28/2010 06:49:36 : 24.67 minutes
Period Beginning 03/03/2010 08:00
Current in Range 99.95 %
Injector Availability 99.91 %
Out of Range at: 03/06/2010 17:07:36 to 03/06/2010 17:11:36 : 4.00 minutes
Injector downtime: 03/06/2010 16:59:36 to 03/06/2010 17:07:36 : 8.00 minutes (est)
Period Beginning 03/10/2010 08:00
Current in Range 99.34 %
Injector Availability 99.23 %
Out of Range at: 03/15/2010 03:12:40 to 03/15/2010 04:06:32 : 53.87 minutes
Injector downtime: 03/15/2010 03:07:44 to 03/15/2010 04:02:24 : 54.67 minutes
Out of Range at: 03/15/2010 05:33:44 to 03/15/2010 05:33:44 : 0.00 minutes
Injector downtime: 03/15/2010 05:25:44 to 03/15/2010 05:33:44 : 8.00 minutes (est)
Period Beginning 03/31/2010 08:00
Current in Range 99.70 %
Injector Availability 99.57 %
Out of Range at: 04/04/2010 01:31:12 to 04/04/2010 01:54:48 : 23.60 minutes
Injector downtime: 04/04/2010 01:26:16 to 04/04/2010 01:54:44 : 28.47 minutes
Out of Range at: 04/05/2010 08:45:20 to 04/05/2010 08:46:56 : 1.60 minutes
Injector downtime: 04/05/2010 08:37:20 to 04/05/2010 08:45:20 : 8.00 minutes (est)
Period Beginning 04/07/2010 08:00
Current in Range 92.33 %
Injector Availability 92.14 %
Out of Range at: 04/08/2010 23:48:48 to 04/09/2010 03:02:16 : 193.47 minutes
Injector downtime: 04/08/2010 23:43:52 to 04/09/2010 03:02:12 : 198.33 minutes
Out of Range at: 04/10/2010 17:52:56 to 04/10/2010 19:03:12 : 70.27 minutes
Injector downtime: 04/10/2010 17:48:00 to 04/10/2010 19:03:08 : 75.13 minutes
Out of Range at: 04/11/2010 11:38:40 to 04/11/2010 13:47:20 : 128.67 minutes
Injector downtime: 04/11/2010 11:33:44 to 04/11/2010 13:44:56 : 131.20 minutes
Out of Range at: 04/12/2010 07:41:44 to 04/12/2010 12:10:24 : 268.67 minutes
Injector downtime: 04/12/2010 07:36:48 to 04/12/2010 12:09:04 : 272.27 minutes
Period Beginning 04/14/2010 08:00
Current in Range 99.80 %
Injector Availability 99.77 %
Out of Range at: 04/19/2010 00:30:00 to 04/19/2010 00:47:04 : 17.07 minutes
Injector downtime: 04/19/2010 00:25:04 to 04/19/2010 00:44:48 : 19.73 minutes