FY 2025 Reliability Summary |
|
|
|
|
|
|
|
|
|
|
|
Reliability
Budget |
|
|
|
|
|
|
System |
Unavailability
Allotment |
|
Number of Faults |
Mean Time to Beam
Loss |
Faults Per |
|
|
Day |
RF |
0.5% |
|
|
200 |
0.12 |
|
|
Diagnostics |
0.1% |
|
|
800 |
0.03 |
|
|
PS |
0.5% |
|
|
200 |
0.12 |
|
|
Controls |
0.3% |
|
|
500 |
0.05 |
|
|
Network |
0.1% |
|
|
4800 |
0.01 |
|
|
Interlocks |
0.2% |
|
|
800 |
0.03 |
|
|
Accelerator |
0.1% |
|
|
2400 |
0.01 |
|
|
Beamline |
0.1% |
|
|
2400 |
0.01 |
|
|
Radiation |
0.1% |
|
|
1600 |
0.02 |
|
|
MOM |
0.4% |
|
|
480 |
0.05 |
|
|
S&A |
0.0% |
|
|
48000 |
0.00 |
|
|
Operations & Analysis |
0.1% |
|
|
4800 |
0.01 |
|
|
Physics |
0.0% |
|
|
48000 |
0.00 |
|
|
ID-FE |
0.1% |
|
|
4800 |
0.01 |
|
|
ID-FE/MD |
not specified |
|
|
|
|
|
|
ID-FE/XFE |
not specified |
|
|
|
|
|
|
Utilities |
0.3% |
|
|
800 |
0.03 |
|
|
Electrical - APS |
0.1% |
|
|
2400 |
0.01 |
|
|
Electrical - ANL |
0.2% |
|
|
2400 |
0.01 |
|
|
Cooling - ANL |
0.1% |
|
|
2400 |
0.01 |
|
|
Other |
0.2% |
|
|
1200 |
0.02 |
|
|
Unidentified |
0.1% |
|
|
1200 |
0.02 |
|
|
Total |
2.9% |
|
|
49.6 |
0.48 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Data through Run 2024-3 |
|
|
|
|
|
|
|
|
|
|
|
|
FY 2025 Actual |
Unavailability |
Unavailability |
Number |
Mean Time |
Faults Per |
|
|
Percent |
Hours |
of Faults |
to Beam Loss |
Day |
RF |
0.77% |
12.05 |
9 |
169.7 |
0.14 |
User Downtime Hours |
41.28 |
Diagnostics |
0.31% |
4.88 |
3 |
509.2 |
0.05 |
|
|
PS |
0.37% |
5.82 |
2 |
763.9 |
0.03 |
Scheduled Hours |
1569 |
Controls |
0.09% |
1.48 |
2 |
763.9 |
0.03 |
|
|
Network |
0.22% |
3.43 |
1 |
1527.7 |
0.02 |
Delivered Hours |
1527.7 |
Safety Interlocks |
0.42% |
6.58 |
9 |
169.7 |
0.14 |
|
|
Radiation Monitors |
0.06% |
0.98 |
2 |
763.9 |
0.03 |
User Availability |
97.37% |
Water/ME |
0.00% |
0.00 |
0 |
|
0.00 |
|
|
Vacuum |
0.11% |
1.77 |
4 |
381.9 |
0.06 |
Longest period w/out a fault |
197.34 |
Operations |
0.00% |
0.00 |
0 |
|
0.00 |
|
|
AOP |
0.00% |
0.00 |
0 |
|
0.00 |
|
|
Utilities |
0.00% |
0.00 |
0 |
|
0.00 |
|
|
Electrical - APS |
0.00% |
0.00 |
0 |
|
0.00 |
|
|
Electrical - ANL |
0.00% |
0.00 |
0 |
|
0.00 |
|
|
Cooling - ANL |
0.00% |
0.00 |
0 |
|
0.00 |
|
|
Other |
0.13% |
2.12 |
2 |
763.9 |
0.03 |
|
|
Unidentified |
0.03% |
0.42 |
1 |
1527.7 |
0.02 |
|
|
APS-U |
|
|
|
|
0.00 |
|
|
Total |
2.52% |
39.53 |
37 |
41.3 |
0.58 |
|
|
|
|
|
|
|
|
|
|
Run 2024-3 |
Unavailability |
Unavailability |
Number |
Mean Time |
Faults Per |
|
|
Percent |
Hours |
of Faults |
to Beam Loss |
Day |
|
|
|
|
|
|
|
|
RF |
0.77% |
12.05 |
9 |
169.7 |
0.14 |
User Downtime Hours |
41.28 |
Diagnostics |
0.31% |
4.88 |
3 |
509.2 |
0.05 |
|
|
PS |
0.37% |
5.82 |
2 |
763.9 |
0.03 |
Scheduled Hours |
1569.0 |
Controls |
0.09% |
1.48 |
2 |
763.9 |
0.03 |
Delivered Hours |
1527.7 |
Network |
|
3.43 |
1 |
|
|
|
|
Safety Interlocks |
0.42% |
6.58 |
9 |
169.7 |
0.14 |
User Availability |
97.37% |
Radiation Monitors |
0.06% |
0.98 |
2 |
763.9 |
0.03 |
|
|
Water/ME |
0.00% |
|
|
|
0.00 |
|
|
Vacuum |
0.11% |
1.77 |
4 |
381.9 |
0.06 |
Longest period w/out a fault |
197.34 |
AOP |
0.11% |
1.75 |
2 |
763.9 |
0.03 |
|
|
MCR |
0.00% |
|
|
|
0.00 |
|
|
ID-FE |
0.00% |
|
|
|
0.00 |
|
|
ID-FE/MD |
0.00% |
|
|
|
0.00 |
|
|
ID-FE/XFE |
0.00% |
|
|
|
0.00 |
|
|
Utilities |
0.00% |
|
|
|
0.00 |
|
|
Electrical - APS |
0.00% |
|
|
|
0.00 |
|
|
Electrical - ANL |
0.00% |
|
|
|
0.00 |
|
|
Cooling - ANL |
0.00% |
|
|
|
0.00 |
|
|
Other |
0.13% |
2.12 |
2 |
763.9 |
0.03 |
|
|
Unidentified |
0.03% |
0.42 |
1 |
1527.7 |
0.02 |
|
|
|
|
|
|
|
|
|
|
Total |
2.63% |
41.28 |
37 |
41.3 |
0.58 |
|
|
|
|
|
|
|
|
|
|
Run 2023-1 |
Unavailability |
Unavailability |
Number |
Mean Time |
Faults Per |
|
|
Percent |
Hours |
of Faults |
to Beam Loss |
Day |
|
|
|
|
|
|
|
|
RF |
#DIV/0! |
|
|
|
0.00 |
User Downtime Hours |
0.00 |
Diagnostics |
#DIV/0! |
|
|
|
0.00 |
|
|
PS |
#DIV/0! |
|
|
|
0.00 |
Scheduled Hours |
|
Controls |
#DIV/0! |
|
|
|
0.00 |
Delivered Hours |
|
Network |
#DIV/0! |
|
|
|
|
|
|
Safety Interlocks |
#DIV/0! |
|
|
|
0.00 |
User Availability |
|
Radiation Monitors |
#DIV/0! |
|
|
|
0.00 |
|
|
MOM |
#DIV/0! |
|
|
|
0.00 |
|
|
Vacuum |
#DIV/0! |
|
|
|
0.00 |
Longest period w/out a fault |
|
Operations |
#DIV/0! |
|
|
|
0.00 |
|
|
AOP |
#DIV/0! |
|
|
|
0.00 |
|
|
Utilities |
#DIV/0! |
|
|
|
0.00 |
|
|
Electrical - APS |
#DIV/0! |
|
|
|
0.00 |
|
|
Electrical - ANL |
#DIV/0! |
|
|
|
0.00 |
|
|
Cooling - ANL |
#DIV/0! |
|
|
|
0.00 |
|
|
Other |
#DIV/0! |
|
|
|
0.00 |
|
|
Unidentified |
#DIV/0! |
|
|
|
0.00 |
|
|
FE-ID |
#DIV/0! |
|
|
|
0.00 |
|
|
Total |
#DIV/0! |
0.00 |
0 |
#DIV/0! |
#DIV/0! |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Updated |
1/8/2025 |
|
|
|
|
|
|
|
|