Shift Summary
APS Running Statistics; FY98 to Present
Scheduled User
Hours
User Beam Available hours
User beam Availability (%)
Total Faults
Mean Time to Recovery
Faults Per Day of Delivered Beam
Delivered Integrated Current
(A-hr)
Hours of Top-up Scheduled
Top-up Injector Availability
MTBF
Run24-3
1569.0
1527.7
97.4%
37
1.1
0.58
184.5
1304
41.3
Run25-1
1887.0
1775.0
94.1%
60
1.9
0.81
152.7
1559
29.6
TOTAL
3456.0
3302.717
95.6%
97
1.6
0.70
337.2
2863
#DIV/0!
34.0
Through 4/17/25the end of Run 2025-1