Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Friday, 01/14/00
|
|
|
0800-1200
|
Switching RF3 to booster and
Restore SR beam
|
Pile
Horan
Yao
|
Stored beam and injection
|
1200-1400
|
Continue to tune DI water temperature, require SR PS and RF in operations condition
|
Swetin
|
Stored beam
|
1200-1600
|
recommission bpm system
|
Decker
Erwin
|
Store beam and injection
|
1600-2000
|
BPLD validation
|
Yao
Pietryla
|
Stored beam and injection
|
2000-2400
|
bpm calibration for orbit correction transient
|
Emery
|
Stored beam and injection
|
|
Saturday, 01/15/00
|
|
|
0000-0300
|
lattice with different beta-Y
|
Emery
|
Stored beam and injection
|
0300-0600
|
OAG software training and S35 dispersion bump
|
Emery
Chae
|
Stored beam and injection
|
0600-1000
|
Investigation of alternate bunch fill patterns
|
Decker
|
Store beam and injection
|
1000-1400
|
Rogue microwave studies
|
Decker
Lill
Song
|
Store beam and injection
|
1400-1800
|
Tuning ID temperature loop on sectors 33-34, needs 100 mA beam current
|
Putnam
|
Stored beam and injection
|
1800-2000
|
Injection test with newly positioned Cerenkov detector
|
Emery
|
Stored beam and injection
|
2000-2400
|
BPM offset measurement
|
OPS
|
Stored beam and injection
|
|
Sunday, 01/16/00
|
|
|
0000-0800
|
STUDY TIME AVAILABLE
|
|
|
0800-1200
|
Re-commissioning of S35 BM and ID imaging system. Needs open shutter on 35ID
|
Lumpkin
Yang
|
Stored beam and injection
|
1200-1600
|
Gated camera imaging acquisition for injection kicker induced beam motion
|
Yang
|
Stored beam and injection
|
1600-2400
|
Orbit feedback system recommissioning and validation
|
Carwardine
Lenkszus
|
Stored beam and injection
|
|
Monday, 01/17/00
|
|
|
0000-0800
|
BPM offset measurement
|
OPS
|
Stored beam and injection
|
0800-1200
|
New Dac test on Par septum
|
Fors
Hillman
|
No injection
|
0800-1630
|
linac to booster injection, BPM test (weekday)
|
Sereno
|
No injection
|
1200-1600
|
Beta funcction measurement for S35/S36
|
Yao
|
No injection
|
1630-1730
|
ID-4 gap test with stored beam
|
Grimmer
|
Stored beam and injection
|
1730-2330
|
ID gap feedforward studies (day or evening)
|
Borland
|
Stored beam and injection
|
2330-2400
|
TIME AVAILABLE FOR STUDIES
|
|
|
|
Tuesday, 01/18/00
|
|
|
0000-0800
|
BPM system datebase maintenance
and BPLD re-validatioin
|
Decker
Singh
Erwin
Pietryla
|
Store beam and injection
|
0800-1400
|
Beam scraping impedance studies
|
Harkay
Lessner
|
Stored beam and injection
|
1400-1700
|
S35 dispersion bump lattice setup
|
Chae
Emery
|
Stored beam and injection
|
1600-2400
|
Linac to booster injection
|
Sereno
|
No injection
|
|
Wednesday, 01/19/00
|
|
|
0000-0100
|
Restore normal operation
|
OPS
|
Stored beam and injection
|
0100-0500
|
S35 dispersion bump lattice setup
|
Chae
|
Stored beam and injection
|
0500-0700
|
TIME AVAILABLE FOR STUDIES
|
|
|
0700-0800
|
Ready for user beam
|
Yao
OPS
|
Stored beam and injection
|
|
|
|
|