Machine Studies

Schedule for Run1-1,2000

Jan. 14, 0800 - Jan. 19, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Friday, 01/14/00

 

 

0800-1200

Switching RF3 to booster and

Restore SR beam

Pile

Horan

Yao

Stored beam and injection

1200-1400

Continue to tune DI water temperature, require SR PS and RF in operations condition

Swetin

Stored beam

1200-1600

recommission bpm system

Decker

Erwin

Store beam and injection

1600-2000

BPLD validation

Yao

Pietryla

Stored beam and injection

2000-2400

bpm calibration for orbit correction transient

Emery

Stored beam and injection

 

Saturday, 01/15/00

 

 

0000-0300

lattice with different beta-Y

Emery

Stored beam and injection

0300-0600

OAG software training and S35 dispersion bump

Emery

Chae

Stored beam and injection

0600-1000

Investigation of alternate bunch fill patterns

Decker

Store beam and injection

1000-1400

Rogue microwave studies

Decker

Lill

Song

Store beam and injection

 

1400-1800

Tuning ID temperature loop on sectors 33-34, needs 100 mA beam current

Putnam

Stored beam and injection

1800-2000

Injection test with newly positioned Cerenkov detector

Emery

Stored beam and injection

2000-2400

BPM offset measurement

OPS

Stored beam and injection

 

Sunday, 01/16/00

 

 

0000-0800

STUDY TIME AVAILABLE

 

 

0800-1200

Re-commissioning of S35 BM and ID imaging system. Needs open shutter on 35ID

Lumpkin

Yang

Stored beam and injection

1200-1600

Gated camera imaging acquisition for injection kicker induced beam motion

Yang

Stored beam and injection

1600-2400

Orbit feedback system recommissioning and validation

Carwardine

Lenkszus

Stored beam and injection

 

Monday, 01/17/00

 

 

0000-0800

BPM offset measurement

OPS

Stored beam and injection

0800-1200

New Dac test on Par septum

Fors

Hillman

No injection

0800-1630

linac to booster injection, BPM test (weekday)

Sereno

No injection

1200-1600

Beta funcction measurement for S35/S36

Yao

No injection

1630-1730

ID-4 gap test with stored beam

Grimmer

Stored beam and injection

1730-2330

ID gap feedforward studies (day or evening)

Borland

Stored beam and injection

2330-2400

TIME AVAILABLE FOR STUDIES

 

 

 

Tuesday, 01/18/00

 

 

0000-0800

BPM system datebase maintenance

and BPLD re-validatioin

Decker

Singh

Erwin

Pietryla

Store beam and injection

0800-1400

Beam scraping impedance studies

Harkay

Lessner

Stored beam and injection

1400-1700

S35 dispersion bump lattice setup

Chae

Emery

Stored beam and injection

1600-2400

Linac to booster injection

Sereno

No injection

 

Wednesday, 01/19/00

 

 

0000-0100

Restore normal operation

OPS

Stored beam and injection

0100-0500

S35 dispersion bump lattice setup

Chae

Stored beam and injection

0500-0700

TIME AVAILABLE FOR STUDIES

 

 

0700-0800

Ready for user beam

Yao

OPS

Stored beam and injection