Machine Studies

Schedule for Run1-11,2000

March 27, 0800 - March 29, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 03/27/00

 

 

0800-1000

Swap temperature control mixing valve positioners in SR sector 36 and RF-4 water systems.

Dortwedgt

No beam

0800-1000

Access sector E for S33 xbpm cable repairs

Singh

Erwin

 

No beam

0800-1000

Replace CNT100 module in iocmtime

Lenkszus

Laird

No beam

1100-1400

Test new installed CNT100 module in iocmtime

Lenkszus

Emery

Stored beam and injection

1000-1100

Operator qualification, recover stored beam

Yao

OPS

Stored beam and injection

1200-1400

Shielding verification of 8BM-A and 4 ID

Mohan

Stored beam and injection

 

1400-2000

S33 ID-Xbpms - map stray radiation

Singh

Stored beam and injection

 

2000-2400

 

Single bunch studies with scrapers to resolve wakefield vs. aperture restriction

Harkay

Lessner

Huang

Yang

Stored beam and injection

 

Tuesday, 03/28/00

 

 

0000-0400

Continue single bunch studies with scrapers to resolve wakefield vs. aperture restriction

Harkay

Lessner

Huang

Yang

Stored beam and injection

0400-0600

Longitudinal multibunch sawtooth instabilities

Harkay

Yang

Stored beam and injection

0600-1400

Bunch cleaning

Sereno

No beam

 

0800-1200

100 Hz Gespac testing with RC filter on ADC/DAC card removed

Carwardine

No beam

1400-1800

Current dependency of energy spread

Yang

Stored beam and injection

 

1800-2400

 

High dispersion lattice and energy spread studies

Chae

Emery

Lumpkin

Yang

Stored beam and injection

 

Wednesday, 03/29/00

 

 

 

0000-0200

High dispersion lattice and energy spread studies

Chae

Emery

Lumpkin

Yang

Stored beam and injection

0200-0600

Install 4 nm-rad lattice

Emery

Stored beam and injection

0600-0730

Kicker induced transient, beam motion and beam loss at single bunch current limit

Yang

 

Stored beam and injection

0730-0800

Ready for user beam

Yao

OPS

Stored beam and injection