Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 01/31/00
|
|
|
0800-1000
|
Inspect S24/25 raw supply for interlock error
|
Carwardine
PS
|
No beam
|
0800-1000
|
Run the wire for multipactor detection system on S40 cavities, including its rack, no access to zone-F
|
Song
|
No beam
|
0800-1000
|
Commission new air handling unit for SR dipole room
|
Carwardine
PS
|
No beam
|
0800-1000
|
Check and re-setup converters S27A:H3 and S28A:H3
|
Carwardine
PS
|
No beam
|
0800-1000
|
Change GRIZWOLD cartridges of absorbers in S4 and S36
|
Putnam
|
No beam
|
1100-1200
|
Verify the timing of SR injection septa
|
Hillman
Goetzen
|
No beam
|
0800-1200
|
BPM repair, need access zone-A-E
|
Erwin
Singh
|
No beam
|
0800-0900
|
Shutoff Rad monitor to see the readback change
|
Yao
|
No beam
|
0800-1200
|
Parallel Klystron operations study without beam requires Zone-F in test mode
|
Nassiri
Horan
|
No injection
|
1200-1400
|
Parallel Klystron operations study with beam
|
Nassiri
Horan
|
Stored beam and injection
|
0800-1600
|
RF1 gain problem investigation
|
Bromberek
Nassiri
|
Concurrent
|
1200-1400
|
Investigate the Unselected Dac problem
|
Carwardine
PS
|
Stored beam and injection
|
1400-1500
|
Re-measure orbit feedback response matrix following S27/28 corrector work
|
Carwardine
PS
|
Stored beam and injection
|
1500-1900
|
BM14 X-ray bpm feedback test
|
Singh
Emery
Lenkszus
|
Stored beam and injection
|
1900-2300
|
Characterize different beta-y lattices
|
Emery
|
Stored beam and injection
|
2300-2400
|
Take bpm data of feedforward corrector compensating the septum leakage field study
|
Emery
|
Stored beam and injection
|
2300-2400
|
Linac to booster injection
|
Sereno
|
No injection
|
|
Tuesday, 02/01/00
|
|
|
0000-0500
|
Thermal effect on orbit study
|
Emery
|
No injection
|
0000-0700
|
Continue Linac to booster injection
|
Sereno
|
No injection
|
0700-0900
|
Single bunch current limit study
|
Kathy
Eliane
Huang
|
Stored beam and injection
|
0900-1100
|
STUDY TIME AVAILABLE
|
|
Stored beam and injection
|
1100-1300
|
Continue single bunch current limit study
|
Kathy
Eliane
Huang
|
Stored beam and injection
|
1300-1700
|
shielding verification with 12mA and 30mA
|
Mohan
|
Stored beam and injection
|
1700-2300
|
High dispersion lattice setup
|
Chae
|
Stored beam and injection
|
2300-2400
|
BPM offset measurement at P3/P4
|
Emery
|
Stored beam and injection
|
|
Wednesday, 02/02/00
|
|
|
0000-0100
|
Continue BPM offset measurement at P3/P4
|
Emery
|
Stored beam and injection
|
0100-0300
|
Orbit corrected to zero setpoint
|
Emery
|
Stored beam and injection
|
0300-0700
|
Injection loss study with Cerekov detector, shutter support needed for at least 6ID, all gaps will be left open.
|
Emery
|
Stored beam and injection
|
0700-0800
|
Ready for user beam
|
Yao
OPS
|
Stored beam and injection
|