Machine Studies

Schedule for Run1-7,2000

Feb.28, 0800 - Mar.1, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 02/28/00

 

 

0800-0805

Top-up studies

Pulse Kicker/Septum at 2 Hz rate for 5 min.

Users

Emery

Yao

OPS

Stored beam and injection

0805-1100

Fill to 100mA and start top-up

Users

Emery

Yao

OPS

Stored beam and injection

1100-1105

Top-up studies

Pulse Kicker/Septum at 2 Hz rate for 5 min.

Users

Emery

Yao

OPS

Stored beam and injection

1105-1400

Fill to 100mA and start top-up

Users

Emery

Yao

OPS

Stored beam and injection

1400-1405

Top-up studies

Pulse Kicker/Septum at 2 Hz rate for 5 min.

Users

Emery

Yao

OPS

Stored beam and injection

1405-2400

Fill to 100 mA and start top-up

Users

Emery

Yao

OPS

Stored beam and injection

 

Tuesday, 02/29/00

 

 

0000-0800

Continue top-up studies. Refill to 30mA by 0800 for shielding verification

Users

Emery

Yao

OPS

Stored beam and injection

0800-1000

Shielding verification for 4ID with 30 mA beam current

Mohan

Stored beam only

0800-0900

Access linac to make a measure on the interferometer box

Berg

Lumpkin

No injection

0800-1200

Install delay line on kicker#2 and test

Wang

Borland

No injection

0800-1200

4hrs access linac for survey checks

Friedsam

Sharma

No injection

1000-1200

USDac modification for S39

Fors

Hillmana

No injection

1000-1200

access to Zone A to fix 1ID problem

Mohan

No beam

1000-1200

access Zone-D and E to check vacuum chambers

Song

Beczek

No beam

1000-1400

access Zone-B to troubleshoot S15B:P4. SR resecure by 1400

Erwin

No beam

1200-1400

Test the operation of modified kicker#2, including normal mode injection into SR

Sereno

Yao

No injection

1400-2000

Linac to booster injection ( injector ready for normal injection by 2000)

Sereno

No injection

1500-1900

Tune utility building's DI water temperature control loop, require SR magnet and RF at operation level

Swetin

No injection

2000-2400

35ID dispersion bump lattice

Emery

Chae

Stored beam and injection

 

Wednesday, 03/01/00

 

 

0000-0100

Continue 35ID dispersion bump lattice

Emery

Chae

Stored beam and injection

0100-0500

Transverse instability measurement using bunch monitor

Emery

Stored beam and injection

0500-0700

Response matrix measurement

Emery

Stored beam and injection

0700-0800

Ready for user beam

OPS

Stored beam and injection