Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 03/13/00
|
|
|
0800-2400
|
Top-up studies
|
Users
Boland
Yao
OPS
|
Stored beam and injection
|
|
Tuesday, 03/14/00
|
|
|
0000-0800
|
Continue top-up studies
|
Users
Borland
Yao
OPS
|
Stored beam and injection
|
0800-1000
|
Investigate possible PAR RF phase problem
|
Smith
|
PAR injection
|
0800-1000
|
Replace PEEL chips in S1B:P4 SCDU unit
|
Erwin
|
No beam
|
0800-1200
|
Authorized access Zone A to fix 8BM EPS problem
|
Stoffel
|
No beam
|
0800-1200
|
Authorized access Zone A to install test equipment on 1ID
|
Mohan
|
No beam
|
0800-1200
|
Authorized access Zone A to remove 5mm IDVC for re-certification
|
Gagliano
|
No beam
|
1000-1200
|
Access to zone-F to open/restart turbo bump on S36 cavities
|
Bromberek
|
No beam
|
1000-1200
|
Access zone-F to replace video fiber into S35 BM pinhole camera
|
Yang
Stevens
|
No beam
|
1000-1200
|
SR operations training
|
Yao
OPS
|
No beam
|
1200-1400
|
Shielding verification for 8BM and 4ID (10 mA for 45 min. and followed by 30 mA)
|
Mohan
|
Stored beam and injection
|
1400-1600
|
Continue shielding verification for 8BM and 4ID (10 mA for 45 min. and followed by 30 mA)
|
Mohan
|
Stored beam, no injection
|
1400-2200
|
Linac to booster injection
|
Sereno
|
No injection
|
1600-2000
|
OAG software test
|
Borland
|
No injection
|
1600-2000
|
Linac/LEUTL PEM test
|
Soliday
|
No injection
|
2000-2200
|
SR operations training
|
OPS
|
Stored beam and injection
|
2200-2400
|
32ID Xray BPM scans
|
Singh
|
Stored beam and injection
|
|
Wednesday, 03/15/00
|
|
|
0000-0200
|
Continue 32ID Xray BPM scans
|
Singh
|
Stored beam and injection
|
0200-0400
|
Bunch phase vs bunch current measurement
|
Yang
|
Stored beam and injection
|
0400-0700
|
Study Time Available
|
|
|
0700-0800
|
Ready for user beam
|
|
Stored beam and injection
|