Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 05/16/00
|
|
|
0800-1000
|
Set up agc for gap voltage control
|
RF group
|
No beam
|
0800-1000
|
ISI work
|
ISI group
|
No beam
|
0800-1000
|
Zone B access for EWM checkout (start locking out Zone B first)
|
C. Yao
|
No beam
|
0800-1000
|
Zone D and E access for S35B:P1 bpm and diamond blade connection (close Zone E first if possible)
|
DIA and SRE groups
|
No beam
|
0800-1030
|
EPROM replacement in SR power supplies (B:V3 and others)
|
PS group
|
No beam
|
1030-1330
|
Corrector glitches on S19AV2
Trim stability tests
|
PS group
|
Stored beam and injection
|
1330-1530
|
Converging beta lattice measurement
|
Sajaev
|
Stored beam and injection
|
1530-1600
|
Recover for User beam
|
OPS
|
Stored beam and injection
|