Machine Studies

Schedule for Run2-4,2000

May 30th, 0800 - 1600

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 05/16/00

 

 

0800-1000

Set up agc for gap voltage control

RF group

No beam

0800-1000

ISI work

ISI group

No beam

0800-1000

Zone B access for EWM checkout (start locking out Zone B first)

C. Yao

No beam

0800-1000

Zone D and E access for S35B:P1 bpm and diamond blade connection (close Zone E first if possible)

DIA and SRE groups

No beam

0800-1030

EPROM replacement in SR power supplies (B:V3 and others)

PS group

No beam

1030-1330

Corrector glitches on S19AV2
Trim stability tests

PS group

Stored beam and injection

1330-1530

Converging beta lattice measurement

Sajaev

Stored beam and injection

1530-1600

Recover for User beam

OPS

Stored beam and injection