Machine Studies

Schedule for Run2-5,2000

June 5th, 0800 - June 7th, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 06/05/00

 

 

0800-2000

12 hrs of top-up injection for Users

OPS

Stored beam and injection

0800-1000

35BM pinhole calibration

B. Yang

Stored beam and injection

2000-2300

ID VC impedance measurement

Decker

Stored beam and injection

2300-2400

Energy spread and bunch length for normal lattice

B.Yang
L. Emery

Stored beam and injection

 

Tuesday, 06/06/00

 

 

0000-0200

Energy spread and bunch length for normal lattice (cont'd)

B.Yang
L. Emer

Stored beam and injection

0200-0400

BPLD tripping test with smaller limits.
OPS starts changing all BPLD limits in
previous hour, and change them back in
following hour.

L. Emery
OPS

Stored beam and injection

0400-0700

EMW studies

C. Yao
J. Wang

Stored beam and injection

0700-1200

gespac eprom replacement

PS group

No beam

0700-1000

glitchy DAC readbacks

T. Fors
PS group

No beam

0700-1000

linac rf gun #1 kicker conditioning

J. Wang
PS group

No beam

0700-0900

new medm screens for linac/PAR/booster PS

McNamara
PS group

No beam

0700-0800

EMW circuit breakers

Markovich
PS group

No beam

0700-0800

Waveguide switch to RF3/RF4 and check acg loops.

Horan
RF group

No beam

1200-1800

XAXSTF, scrape down for Xray blades.

Decker
Singh
Lenkszus

Stored beam and injection

1200-1800

linac rf gun #1 conditioning (parasitically to stored beam in SR)

Pasky

Stored beam and injection

1800-2100

converging betax lattice correction and
optical measurements

L. Emery
V. Sajaev

Stored beam and injection

2100-2400

microwave instability 2 f_s measurement

J. Song
Y. Chae
A. Lumpkin

Stored beam and injection

 

Wednesday, 06/07/00

 

 

0000-0530

Single bunch instabilities

Harkay
Lessner

Stored beam and injection

0530-0730

Orbit feedback development

C. Schwartz
F. Lenkszus

Stored beam and injection

0730-0800

SR User run startup

OPS

Stored beam and injection