Friday, 07/28/00
|
|
|
0800-1600
|
Bunch compressor studies
|
Borland
|
No injection
|
0800-1200
|
35-BM pinhole camera setup
|
Yang
|
Stored beam and injection
|
1600-2000
|
Store beam and correct tunes to standard values, S25 BPM timing adjustment
(postponed)
|
Emery
|
Stored beam and injection
|
2000-2300
|
Check and correct lattice function
(postponed)
|
Emery
|
Stored beam and injection
|
|
Saturday, 07/29/00
|
|
|
0000-0800
|
Emergency PAR kicker magnet repair
|
magnet group
|
Stored beam and injection
|
1600-2000
|
X-ray BPM data acquisition checkout
|
Roberts
Erwin
Singh
|
Stored beam, no injection
|
1600-2000
|
linac control access for laser alignment
|
Lewellen
|
Stored beam, no injection
|
2000-2400
|
X-ray BPM feedback test
|
Singh
OPS
|
Stored beam and injection
|
0800-1600
|
Bunch Compressor studies
(canceled)
|
Borland
|
No injection
|
1600-2000
|
Beta function measurement
(canceled)
|
Emery
Yao
OPS
|
Stored beam and injection
|
|
Sunday, 07/30/00
|
|
|
0000-0800
|
Converging beta lattice study (postponed or canceled)
|
Sajaev
Emery
|
Stored beam and injection
|
0800-1600
|
Tune-up RF BPMs and ring lattice correction
|
Singh
Decker
Emery
|
Stored beam and injection
|
1200-1600
|
Store beam and
BPLD validations and DBPLD tests
|
Emery
Pietryla
Decker
|
Stored beam and injection
|
0800-1600
|
X-ray BPM studies
|
Singh
Decker
|
Stored beam and injection
|
1600-2400
|
X-ray BPM feedback test
|
Singh
Decker
OPS
|
Stored beam, no injection
|
1400-1600
|
Gated camera test
|
Yang
|
Stored beam and injection
|
1600-2400
|
Bunch Compressor studies with PC gun (Canceled)
|
Borland
Lewellen
|
No injection
|
|
Monday, 07/31/00
|
|
|
0000-0600
|
RT Feedback development
|
Carwardine
Schwartz
|
Stored beam and injection
|
0600-0800
|
Kicker bumps measurement with beam
|
Emery
|
Stored beam and injection
|
0800-1000
|
Use S39B:P1 to measure trajectory bump from injection kickers
|
Emery
|
Stored beam and injection
|
1000-1600
|
Chromaticity map II
|
Harkay
Lessner
|
Stored beam and injection
|
1600-2000
|
100 Hz glitch detector system test
|
Fors
|
No injection
|
1600-2400
|
Bunch Compressor studies
|
Borland
|
No injection
|
1600-1700
|
Access ZoneA to repair S5BP1 BPM
|
Lill
Erwin
|
No injection
|
|
Tuesday, 08/01/00
|
|
|
0000-0800
|
X-ray BPM studies
|
Decker
Singh
|
Stored beam and injection
|
0800-1000
|
Repair the helios server
|
Stejskal
|
No beam
|
0800-1200
|
RF2 study
|
Nassiri
Horan
|
Stored beam and injection
|
1200-1800
|
7MV RF voltage Energy spread measurement
|
Yang
Chae
Kathy
|
Stored beam and injection
|
1200-1800
|
Simultaneous measurement of energy spread, bunch length, spectrum vs current
|
Emery
|
Stored beam and injection
|
1800-2200
|
Continue 100 Hz glitch detector system test (possibly parallel studies if beam is not dumped)
|
Fors
|
Stored beam, No injection
|
1800-2400
|
Bunch Compressor studies with PC gun
|
Milton
|
No injection
|
|
Wednesday, 08/02/00
|
|
|
0000-0800
|
X-ray BPM test
|
Singh
Hahne
|
Stored beam and injection
|
0800-1200
|
Amplitude dependent tune shift
|
Harkay
Lessner
|
Stored beam, and injection
|
1200-2000
|
Shielding verification of station B/C of 34ID
|
Mohan
|
Stored beam, No injection
|
2000-2400
|
Growth rate measurement of longitudinal instability
|
Chae
Horan
Song
|
Stored beam, and injection
|
|
Thursday, 08/03/00
|
|
|
0000-0400
|
4nm lattice study
|
Emery
|
Stored beam, and injection
|
0400-0730
|
Investigate y-emittance blow-up in 6+8X7 pattern
|
Emery
|
Stored beam, and injection
|
0730-0800
|
Ready for User beam with singlet bunch fill pattern
|
OPS
|
Stored beam and injection
|