Machine Studies

Schedule for Run3-6,2000

September 4, 0800 - September 6, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, September 4

 

 

0800-1600

X-bpm blade background signal reduction

Decker

Singh

Tim Roberts

Stored beam and injection

1600-2100

Converging lattice study

Sajaev

Stored beam and injection

2100-2400

Beam lifetime vs beam size scan

Lumpkin

Yang

Yao

Stored beam and injection

 

Tuesday, September 5

 

 

0000-0800

4 nm lattice study

Emery

Stored beam and injection

0800-1200

X-ray bpm/feedback system interface test

Decker

Lenkszus

No injection

0800-1200

 

Measure of various flow in the linac tunnel and in RF gun test room

Pasky

No injection

0800-1200

 

RF study on SR and Booster RF system

Horan

Nassiri

No beam

0800-1100

Install fiber cable to test a new Altera chip for bit-bus sniffer

Fors

Donkers

No beam

0800-0900

Replace indicator light bulbs of PAR kicker control panels

Klick

No injection

1200-1400

Shielding verification for 34ID-C/D with 30mA stored beam (RT feedback system may not available due to concurrent studies)

Mohan

Stored beam and injection

1400-2000

X-ray bpm AC lock-in position offset determination test

Decker

Singh

Stored beam and injection

2000-2400

Chromaticity map

Harkay

Lessner

Sajaev

Stored beam and injection

 

Wednesday, September 6

 

 

0000-0200

Energy spread as function of beam current

Chae

Emery

Yang

Stored beam and injection

0200-0400

Growth rate measurement of longitudinal instability

Chae

Horan

Song

Stored beam and injection

0400-0630

Measure kicker bumps as function of beam time

Emery

Stored beam and injection

0730-0800

Ready for User beam with singlet bunch fill pattern

OPS

Stored beam and injection