Machine Studies

Schedule for Run3-7,2000

September 12, 0800 - 1600

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, September 12

 

 

0800-0930

Access Zone F to test S39 flag, control access, full LOTO

Berg

No beam

0800-0900

Switch to RF4 for beam test (may need to switch back to RF1 for user run)

Horan

No beam

0930-1100

Test SR dipole DAC interface

McNamara

No beam

0800-0830

Swap our Altera chip in the bit-bus sniffer

Fors

No beam

0730-1100

Install flag camera for bunch compressor, need access Linac, AA and full LOTO

Yang

No Injection

0800-1100

Test 100 Hz and USDac SCAN fields

Fors

No beam

0800-1100

Replace and investigate S31B:V3 and S18B:Q1 supplies

Carwardine

No beam

0800-0900

Remove unused SR trim converters from SR.

Seglem

No beam

0900-1000

Investigate AGC loop disengage problem

Nassiri

Horan

No beam

1100-1500

Commissioning X-ray bpm feedback

Decker

Singh

Erwin

Stored beam and injection

1500-1530

SR lifetime study

Yao

Stored beam and injection

1530-1600

Ready for User beam with singlet bunch fill pattern

OPS

Stored beam and injection