Machine Studies

Schedule for Run3-9,2000

September 26, 0800 - 1600

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, September 12

 

 

0800-0900

Investigate problem with RF4 collector interlock

Horan

No beam

0800-0900

Investigate intermittent changes in RF2 power phase loop

Horan

No beam

0800-0930

Split the S2/3 Gespac reset line

Maclean

Donkers

No beam

0800-1030

Test new corrector DAC control chip in S4/5

Fors

No beam

1030-1130

Scrape down of hybrid bunch fill pattern

Decker

Stored beam and injection

1130-1330

Orbit correction parameters study

Decker

Singh

Stored beam and injection

1330-1530

Impedance measurement of ID VC with 8mm gap

Emery

Stored beam and injection

1530-1600

Ready for User beam with 6+8X7 hybrid bunch fill pattern

OPS

Stored beam and injection