Tuesday, September 12
|
|
|
0800-0900
|
Investigate problem with RF4 collector interlock
|
Horan
|
No beam
|
0800-0900
|
Investigate intermittent changes in RF2 power phase loop
|
Horan
|
No beam
|
0800-0930
|
Split the S2/3 Gespac reset line
|
Maclean
Donkers
|
No beam
|
0800-1030
|
Test new corrector DAC control chip in S4/5
|
Fors
|
No beam
|
1030-1130
|
Scrape down of hybrid bunch fill pattern
|
Decker
|
Stored beam and injection
|
1130-1330
|
Orbit correction parameters study
|
Decker
Singh
|
Stored beam and injection
|
1330-1530
|
Impedance measurement of ID VC with 8mm gap
|
Emery
|
Stored beam and injection
|
1530-1600
|
Ready for User beam with 6+8X7 hybrid bunch fill pattern
|
OPS
|