Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 11/13/00
|
|
|
0800-1200
|
Linac access to complete installation of PC gun
|
Ops
|
Stored beam and no injection
|
0800-0930
|
Software test of RT-DC overlap compensation I (keep User Studies stored beam)
|
Emery
Schwartz
|
Stored beam and no injection
|
0800-0900
|
Adjust neutron shield inside 3ID-A
|
Job Vacca
|
Stored beam and no injection
|
0930-1200
|
Zone B access for slow ID9 gap motion
|
Grimmer
|
No beam
|
1000-1200
|
Install back-up power supply to EMW. Requires bringing down some power and IOCs in Zone B.
|
PS group
|
No beam
|
1000-1200
|
SR RF studies I
|
RF group
|
No beam
|
1200-1400
|
SR RF studies II
|
RF group
|
Stored beam and injection
|
1400-1600
|
SR bunch cleaning
|
Yao
|
Stored beam and injection
|
1600-1700
|
Instability with all 1296 buckets filled
|
Harkay
|
Stored beam and injection
|
1700-2100
|
Single bunch vs chromaticity
|
Harkay
Lessner
|
Stored beam and injection
|
2100-2300
|
Software test of RT-DC overlap compensation II
|
Emery
Schwartz
|
Stored beam and injection
|
2300-2400
|
Check first-turn trajectory and proper scraper positions
|
Emery
|
Stored beam and injection
|
|
Tuesday, 11/14/00
|
|
|
0000-0300
|
Optics correction from measurement of betas at 60 quadrupoles.
|
Emery
|
Stored beam and injection
|
0300-0600
|
Local impedance measurement by bump method
|
Emery
|
Stored beam and injection
|
0600-0900
|
RF bpm timing
|
Lenkszus
Singh
|
Stored beam and injection
|
0900-1300
|
PAR RF studies with linac beam
|
RF group
|
No beam
|
0900-1100
|
S26AS1 converter, and calibration errors on S14AS3, S12AQ
|
PS group
|
No beam
|
0900-1300
|
SR dipole PS regulator
|
Wang
|
No beam
|
1300-1700
|
Multibunch instability threshold
|
Harkay
Lessner
|
Stored beam and injection
|
1700-1800
|
SR RF agc loop/mps test
|
Horan
|
Stored beam and injection
|
1800-2000
|
Bunch Cleaning II
|
Yao
|
Stored beam and injection
|
2000-2300
|
Harmonic sextupole scan for the converging beta
|
Sajaev
Emery
|
Stored beam and injection
|
2300-2400
|
X-bpm studies
|
Decker
Erwin
Hahne
|
Stored beam and injection
|
|
Wednesday, 11/15/00
|
|
|
0000-0730
|
X-bpm studies
|
Decker
Erwin
Hahne
|
Stored beam and injection
|
0730-0800
|
SR User run startup
|
OPS
|
Stored beam and injection
|