Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 12/11/00
|
|
|
0800-1000
|
Zone A autorized access for photon shutter cylinder repair.
|
BO group
|
No beam
|
0800-0900
|
SR RF waveguide switch
|
RF group
|
No beam
|
0800-1000
|
New Gespac EPROMS in Zone A
|
PS group
|
No beam
|
0800-1000
|
Booster re-qualification test for the Operators.
|
OPS
|
No beam
|
1000-1030
|
Recovery
|
OPS
|
No beam
|
1030-1830
|
BPM scrape down and other bpm studies
|
Erwin
Singh
|
Stored beam and injection
|
1830-2230
|
Microwave Instability Study using RF-shaker
|
Chae
Song
Horan
|
Stored beam and injection
|
2230-2400
|
Software test of RT-DC overlap compensation
|
Emery
Schwartz
|
Stored beam and injection
|
|
Tuesday, 12/12/00
|
|
|
0000-0100
|
Software test of RT-DC overlap compensation
|
Emery
Schwartz
|
Stored beam and injection
|
0100-0500
|
Local impedance measurement by bump method
|
Emery
|
Stored beam and injection
|
0500-0700
|
Available
|
|
Stored beam and injection
|
0700-1100
|
X-bpm studies
|
Decker
Singh
|
Stored beam and injection
|
1100-1300
|
Linac access for laser alignement
|
Biedron
|
Stored beam. No injection
|
1100-1400
|
35-BM pinhole camera commissioning.
35BM shutter open.
|
Yang
|
Stored beam. No injection
|
1300-1400
|
Bpm history data acquisition tests.
|
Borland
|
Stored beam and injection
|
1400-1600
|
APD installation and testing for 35ID.
35ID shutter open.
|
Lumpkin
|
Stored beam and injection
|
1600-2200
|
Orbit motion source identification
|
Schwartz
|
Stored beam and injection
|
2200-2400
|
Lattice correction to converging beta lattice
|
Sajaev
Emery
|
Stored beam and injection
|
|
Wednesday, 12/13/00
|
|
|
0000-0300
|
Lattice correction to converging beta lattice (cont.)
|
Sajaev
Emery
|
Stored beam and injection
|
0300-0730
|
Beta function correction
|
Emery
|
Stored beam and injection
|
0730-0800
|
SR User run startup
|
OPS
|
Stored beam and injection
|