Machine Studies

Schedule for Run1-1,2001

Jan. 12, 0800 - Jan. 17, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Friday, 01/12/01

 

 

0000-0800

Equipment checkout, possibly injection

Ops

Stored beam and injection

0800-1600

Setup standard lattice and store beam

Emery

Yao

Stored beam and injection

1600-2400

 

RF cavity conditioning (may start earlier)

Nassiri

Ops

Store beam and injection

1600-2400

BPM timing scan

Decker

Erwin

Stored beam and injection

 

Saturday, 01/13/01

 

 

0000-2400

RF cavity conditioning

Nassiri

Ops

Store beam and injection

0000-1500

Beta function measurement

Emery

Ops

Store beam and injection

0900-1200

RTFeedback test

Carwardine

Store beam and injection

 

 

 

 

1500-1800

Test IOC response time with 100 Hz monitor enabled

Fors

Maclean

Stored beam and injection

1800-2400

Response matrix measurement for linear mode determination

Sajaev

Stored beam and injection

 

Sunday, 01/14/01

 

 

0000-0800

Low emittance lattice study

Emery

Stored beam and injection

0800-1200

Girder movement studies

Lessner

Yao

Stored beam and injection

1200-1600

BPLD validation

Pietryla

Stored beam and injection

1600-2400

P0 BPM test

Singh

Erwin

Stored beam and injection

 

Monday, 01/15/01

 

 

0000-0500

Converging beta lattice

Sajaev

Stored beam and injection

0500-0800

Start up orbit feedback for user run and test new BPM movie records

Carwardine

Lenkszus

Stored beam and injection

0800-1200

pinhole camera line and resolution measurement, need 35 BM shutters support

Yang

 

Stored beam and injection

1200-1800

Xray BPM test

Singh

Hahne

Stored beam and injection

1800-2400

BPM intensity scan, default configuration

Singh

Erwin

Decker

Stored beam and injection

 

Tuesday, 01/18/01

 

 

0000-0100

BPM intensity scan, default configuration

Singh

Erwin

Decker

Stored beam and injection

0100-0700

Orbit motion source ID test.

Schwartz

Stored beam and injection

0700-0900

BPM intensity scan, default configuration (Depending on RF conditoning process)

Singh

Erwin

Decker

Stored beam and injection

0700-0930

Waveguide switch from RF3 to RF2

(Concurrent with low emittance study)

Cours

Nassiri

No beam

0700-1300

Low emittance lattice studies

(Depending on RF coditioning process)

Borland

Emery

Stored beam and injection

1300-1700

Single bunch studies (Depending on RF coditioning process)

Yang

Harkay

Lessner

Stored beam and injection

1700-2100

Electron cloud studies(Depending on RF coditioning process)

Harkay

Rosenberg

Stored beam and injection

2100-2400

Impedance studies with local bump(Depending on RF coditioning process)

Emery

Stored beam and injection

 

Wednesday, 01/17/01

 

 

0000-0300

Thermal effect study(Depending on RF coditioning process)

Emery

Stored beam and injection

0300-0700

 

To be determined

OPS

Stored beam and injection

0700-0800

Ready for user beam

Yao

OPS

Stored beam and injection

 

End of Studies