Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 01/23/01
|
|
|
0730-1000
|
Run PAR septum to remedy BESOCM noise issue (control access, no group loto, no loto for PAR kickers)
|
Banks
Pietryla
Mcnamara
Gold
|
No beam
|
0800-1000
|
Repair 19ID shutter (Zone-C control access with switch gear loto)
|
Mohan
|
No beam
|
0800-0900
|
Check 14BM P2B cable connectors (Zone B control access with switch gear loto)
|
Hahne
|
No beam
|
0800-0830
|
Check waveguide/coupler interface alignment (control access with switch gear loto)
|
Nassiri
Bromberek
|
No beam
|
0800-1030
|
Switch to RF3, and test
|
Nassiri
Cours
|
No beam
|
0800-0900
|
Investigate S24/25 raw supply trips
|
Carwardine
PS
|
No beam
|
0800-0900
|
Reboot bpm iocs
|
Lenkszus
|
No beam
|
0800-1030
|
Operator training
|
Ops
|
No beam
|
1030-1230
|
Low emittance lattice studies
|
Emery
|
Stored beam and injection
|
1230-1330
|
S35 beta-function measurement
|
Emery
|
Stored beam and injection
|
1330-1430
|
Cerenkov detector timing
|
Emery
|
Stored beam and injection
|
1430-1530
|
Comission BM14/13 xbpm orbit feedback
|
Emery
Singh
|
Stored beam and injection
|
1530-1600
|
Ready for User beam
|
OPS
|
Stored beam and injection
|