Machine Studies

Schedule for Run1-5,2001

Feb. 12, 0800 - Feb. 14, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 02/12/01

 

 

0730-0930

Access linac to fix vacuum leak

Goeppner

VAC

No beam

0800-0900

Access Zone D to install the new type of filter comparator at S25BP1. Control access with S24/25 LOTO, Zone-D MPEOB LOTO, and one operator escort.

Erwin

Lill

No beam

0800-1000

Troubleshoot S27B:H4 readback glitches

Fors

No beam

0830-0930

Access booster to inspect injection septum. Control access, switch gear LOTO

J. Wang

No beam

0830-0930

Access Zone E to fix a light

Yang

No beam

0800-1000

BPLD/DBPLD hardware swapping

Pietryla

Arnold

No beam

1000-1300

Single bunch instability imaging

Yang

Harkay

Lessner

Stored beam and injection

1300-1500

Electron cloud study

Harkay

Ronsenberg

Stored beam and injection

1500-1900

Missing Q1 lattice study

Borland

Stored beam and injection

1900-2200

Model independent analysis

Borland

Sajaev

C. Wang

Stored beam and injection

2200-2400

BPM scrapedown study with new filter comparator at S25BP1

Decker

Stored beam and injection

 

Tuesday, 02/13/01

 

 

0000-0100

BPM scrapedown study with new filter comparator at S25BP1

Decker

Stored beam and injection

0100-0300

DC-RT feedback overlap study

Emery

Schwartz

Stored beam and injection

0300-0600

Local impedance measurement

Emery

Stored beam and injection

0600-0800

DBPLD test

Pietryla

Emery

Stored beam and injection

0800-1200

ID feedforward testing and characterizing 10ID

Emery

Borland

Lenkszus

Stored beam and injection

1200-1400

Operator qualification

Yao

Stored beam and injection

1400-1800

Commissioning fast camera at 35BM-B

Yang

Stored beam and injection

1800-2000

SR bunch cleaning test

Yao

Stored beam and injection

2000-2400

Converging beta lattice study

Sajaev

Stored beam and injection

 

Wednesday, 02/14/01

 

 

0000-0600

Low emittance lattice study

Sajaev

Emery

Stored beam and injection

0600-0730

Injection loss investigation with Cerekov detectors

Emery

Stored beam and injection

0730-0800

Ready for user beam

OPS

Stored beam and injection