Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 02/20/01
|
|
|
0800-1200
|
Prepare RF waveguide for RF shutter test
|
Horan
Nassiri
RF group
|
No beam
|
0800-1000
|
Access zone F to fix the cavity ion gauge problem, control access, LOTO switch gears
|
Bromberek
VAC group
|
No beam
|
0800-1200
|
14 ID DBPLD test without beam
|
Pietryla
|
No beam
|
0800-1030
|
Add clamp circuit filter to Quads and Sextupoles in one double sector
|
Carwardine
PS group
|
No beam
|
0800-1200
|
100 Hz glitches troubleshoot in S27B:H4
|
Fors
|
No beam
|
0800-1000
|
update Gespac EPROMs in SR relay racks
|
Fors
Donkers
|
No beam
|
0800-1000
|
Verify operational procedures for PAR kickers supplies
|
Wang
Klick
|
No beam
|
1200-1300
|
Test new PEM tool for SR start up
|
Emery
|
Stored beam and injection
|
1100-1300
|
SR operator re-qualification
|
Yao
Christensen
Ops group
|
Stored beam and injection
|
1300-1430
|
Try quads correction
|
Emery
|
Stored beam and injection
|
1430-1530
|
Beam loss measurement
|
Emery
|
Stored beam and injection
|
1530-1600
|
Ready for user beam
|
Ops group
|
Stored beam and injection
|