Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 02/26/01
|
|
|
0800-0900
|
all 420 RF off and MCR-group-LOTO, pull out the straight section from port #2 of the test circulator...
|
Nassiri
Horan
|
No beam
|
0800-0900
|
Switch PSR28A to PSR28B to rebuild motor, not affecting operations
|
R. Ferry
|
No beam
|
0800-0900
|
Replace suction vibration isolator on PSR34A, not affecting operations
|
R. Ferry
|
No beam
|
0800-0900
|
Try out the new corrector database in one double sector of the storage ring
|
Maclean
|
No beam
|
0800-0900
|
Operator training
|
OPS Group
Keyser
|
No beam
|
0800-0900
|
DBPLD validation and board swapping
|
Pietryla
|
No beam
|
0800-1700
|
water system work on S35
|
Biggs
|
Not affecting studies
|
0900-1000
|
Operator training
|
OPS Group
Keyser
|
Stored beam and injection
|
0900-1000
|
DBPLD validation and board swapping
|
Pietryla
|
Stored beam and injection
|
1000-1300
|
Feedforward studies
|
Borland
|
Stored beam and injection
|
1300-1700
|
all 420 rf off and MCR-group-LOTO,swap location of waveguide shutter in order to perform the isolation (shutter
closed) test.
|
Nassiri
Horan
|
No beam
|
1430-1600
|
Investigate iocs13vp reboot problem
|
Hillman
Maclean
Carwardine
|
No beam
|
1300-1700
|
Complete diagnosis/repair of S27 converter interface board
|
Fors
|
No beam
|
1300-1500
|
Inspect Gespacs for linac RG1/RG2 kickers
|
Carwardine
PS Group
|
No beam
|
1700-2100
|
Converging beta lattice
|
Sajaev
|
Stored beam and injection
|
2100-2400
|
characterization of 3.3 nm-rad lattice
|
Emery
|
Stored beam and injection
|
|
Tuesday, 02/27/01
|
|
|
0000-0400
|
Quad correction studies
|
Emery
|
Stored beam and injection
|
0400-0500
|
Operator training
|
OPS Group
Schroeder
|
Stored beam and injection
|
0500-0800
|
studies on orbit motion
source-ID/source-localization
|
Schwartz
|
Stored beam and injection
|
0800-1100
|
electron cloud studies
|
Harkay
|
Stored beam and injection
|
1100-1300
|
Timing interleave code
|
Lenkszus
Borland
|
Stored beam and injection
|
1300-1600
|
Single bunch instability imaging
|
Yang
|
Stored beam and injection
|
1600-2000
|
Linear lattice study
|
Sajaev
|
No beam
|
2000-2100
|
SR recovery PEM
|
Emery
|
Stored beam and injection
|
2100-2300
|
ID VC impedance measurement of ID4
|
Emery
|
Stored beam and injection
|
2300-2400
|
reduce beam losses by adjusting lattice
|
Emery
|
Stored beam and injection
|
|
Wednesday, 02/28/01
|
|
|
0000-0200
|
reduce beam losses by adjusting lattice
|
Emery
|
Stored beam and injection
|
0200-0400
|
beam loss studies with cerenkov detector
|
Emery
|
Stored beam and injection
|
0400-0600
|
vertical scraper position scan with stored beam to characterize the counts readback of the cerenkov detector
|
Emery
|
Stored beam and injection
|
0600-0730
|
Bunch cleaning study
|
Yao
|
Stored beam and injection
|
0600-0800
|
Operator training
|
OPS Group
Schroeder
|
Stored beam and injection
|
0730-0800
|
Ready for user beam
|
OPS
|
Stored beam and injection
|