Machine Studies

Schedule for Run1-7,2001

Feb. 26, 0800 - Feb. 28, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 02/26/01

 

 

0800-0900

all 420 RF off and MCR-group-LOTO, pull out the straight section from port #2 of the test circulator...

Nassiri

Horan

No beam

0800-0900

Switch PSR28A to PSR28B to rebuild motor, not affecting operations

R. Ferry

No beam

0800-0900

Replace suction vibration isolator on PSR34A, not affecting operations

R. Ferry

No beam

0800-0900

Try out the new corrector database in one double sector of the storage ring

Maclean

No beam

0800-0900

Operator training

OPS Group

Keyser

No beam

0800-0900

DBPLD validation and board swapping

Pietryla

No beam

0800-1700

water system work on S35

Biggs

Not affecting studies

0900-1000

Operator training

OPS Group

Keyser

Stored beam and injection

0900-1000

DBPLD validation and board swapping

Pietryla

Stored beam and injection

1000-1300

Feedforward studies

Borland

Stored beam and injection

1300-1700

all 420 rf off and MCR-group-LOTO,swap location of waveguide shutter in order to perform the isolation (shutter

closed) test.

Nassiri

Horan

No beam

1430-1600

Investigate iocs13vp reboot problem

Hillman

Maclean

Carwardine

No beam

1300-1700

Complete diagnosis/repair of S27 converter interface board

Fors

No beam

1300-1500

Inspect Gespacs for linac RG1/RG2 kickers

Carwardine

PS Group

No beam

1700-2100

Converging beta lattice

Sajaev

Stored beam and injection

2100-2400

characterization of 3.3 nm-rad lattice

Emery

Stored beam and injection

 

Tuesday, 02/27/01

 

 

0000-0400

Quad correction studies

Emery

Stored beam and injection

0400-0500

Operator training

OPS Group

Schroeder

Stored beam and injection

0500-0800

studies on orbit motion

source-ID/source-localization

Schwartz

Stored beam and injection

0800-1100

electron cloud studies

Harkay

Stored beam and injection

1100-1300

Timing interleave code

Lenkszus

Borland

Stored beam and injection

1300-1600

Single bunch instability imaging

Yang

Stored beam and injection

1600-2000

Linear lattice study

Sajaev

No beam

2000-2100

SR recovery PEM

Emery

Stored beam and injection

2100-2300

ID VC impedance measurement of ID4

Emery

Stored beam and injection

2300-2400

reduce beam losses by adjusting lattice

Emery

Stored beam and injection

 

Wednesday, 02/28/01

 

 

0000-0200

reduce beam losses by adjusting lattice

Emery

Stored beam and injection

0200-0400

beam loss studies with cerenkov detector

Emery

Stored beam and injection

0400-0600

vertical scraper position scan with stored beam to characterize the counts readback of the cerenkov detector

Emery

Stored beam and injection

0600-0730

Bunch cleaning study

Yao

Stored beam and injection

0600-0800

Operator training

OPS Group

Schroeder

Stored beam and injection

0730-0800

Ready for user beam

OPS

Stored beam and injection