Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Thursday, 5/3/01
|
|
|
0800-1000
|
Check SR RF AGC loop at 30 kW/cavity (necessary before stored beam)
|
Horan
|
No stored beam
|
0800-2400
|
Ongoing RF conditioning
|
OPS
|
Stored beam and injection
|
0800-1200
|
Setup first stored beam in SR.
|
Emery
|
Stored beam and injection
|
1200-1600
|
100Hz glitch detection. No Beam. May be moved earlier to 0800h if RF is not ready.
|
Fors
|
No stored beam
|
1600-2400
|
SR bpm timing/scdu
|
Decker
Lill
Singh
|
Stored beam and injection
|
|
Friday, 5/4/01
|
|
|
0000-2400
|
Ongoing RF conditioning
|
OPS
|
Stored beam and injection
|
0000-0400
|
Open (Beta function measurement)
|
OPS
|
Stored beam and injection
|
0400-0800
|
Response matrix measurement
|
Sajaev
|
Stored beam and injection
|
0800-1600
|
BPLD/DBPLD validation.
|
Pietryla
|
Stored beam and injection
|
1600-2400
|
SR bpm timing/scdu
|
Decker
Lill
Singh
|
Stored beam and injection
|
|
Saturday, 5/5/01
|
|
|
0000-2400
|
Ongoing RF conditioning
|
OPS
|
Stored beam and injection
|
0000-0800
|
Open (Beta function measurement)
|
OPS
|
Stored beam and injection
|
0300-0500
|
Operator PAR training
|
OPS
|
Stored beam and injection
|
0800-1200
|
Model independent analysis.
|
Borland
Wang
Sajaev
|
Stored beam and injection
|
1200-1600
|
Cerenkov counter checkout
|
Emery
Pietryla
|
Stored beam and injection
|
1600-2000
|
ID4 CPU commissioning (phase 0)
|
Emery
Vasserman
and others
|
Stored beam and injection
|
2000-2400
|
Open (Beta function measurement)
|
OPS
|
Stored beam and injection
|
|
Sunday, 5/6/01
|
|
|
0000-2400
|
Ongoing RF conditioning
|
OPS
|
Stored beam and injection
|
0000-1200
|
Open (Beta function measurement)
|
OPS
|
Stored beam and injection
|
0300-0500
|
Operator PAR training (parasitic to beta function masurement)
|
OPS
|
Stored beam and no injection
|
0800-1200
|
RT/DC orbit correction overlap compensation.
|
Emery
Schwartz
|
Stored beam and injection
|
1200-1600
|
Pinhole camera resolution measurement. (Need 35BM shutters open)
|
Yang
|
Stored beam and injection
|
1600-2100
|
Xbpm Data acquisition work
|
Hahne
Erwin
|
Stored beam and injection
|
2100-2300
|
Operator SR training (canceled if RF conditioning is not close to 100 mA)
|
OPS
|
Stored beam and no injection
|
2300-2400
|
Open (Beta function measurement)
|
OPS
|
Stored beam and injection
|
|
Monday, 5/7/01
|
|
|
0000-0800
|
Ongoing RF conditioning
|
OPS
|
Stored beam and injection
|
0000-0700
|
Open (Beta function measurement)
|
OPS
|
Stored beam and injection
|
0700-0800
|
Operator SR training
|
OPS
|
Stored beam and injection
|
0800-0800
|
Expect to have reached 100 mA after 4 days of conditioning.
|
|
Stored beam and injection
|
0800-0830
|
SR RF sitch-over
|
RF
|
Stored beam and injection
|
0800-1600
|
SR P1 offset measurement
|
OPS
|
Stored beam and injection
|
1000-1100
|
OAG applications demonstration to visitors
|
Borland
|
Stored beam and injection
|
1600-2400
|
SR Xbpm/P0 study
|
Hahne
Lester
Singh
|
Stored beam and injection
|
|
Tuesday, 05/08/01
|
|
|
0000-0700
|
Single bunch instability imaging.
|
Yang
|
Stored beam and injection
|
0700-0900
|
Operator SR training
|
OPS
|
Stored beam and injection
|
0900-1500
|
Single bunch instab vs. amplitude-dep. tune shift
|
Harkay
|
Stored beam and injection
|
1500-1600
|
Operator SR training
|
OPS
|
Stored beam and injection
|
1600-2400
|
Orbit work and intensity scan.
|
Singh
Erwin
|
Stored beam and injection
|
|
Wednesday, 5/9/01
|
|
|
0000-0300
|
Converging beta
|
Sajaev
|
Stored beam, and injection
|
0300-0700
|
Bunch cleaning
|
Yao
|
Stored beam, and injection
|
0700-0800
|
Setup for User beam
|
OPS
|
Stored beam, and injection
|