Machine Studies

Schedule for Run2-1,2000

May 3rd, 0800 - May 9th, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Thursday, 5/3/01

 

 

0800-1000

Check SR RF AGC loop at 30 kW/cavity (necessary before stored beam)

Horan

No stored beam

0800-2400

Ongoing RF conditioning

OPS

Stored beam and injection

0800-1200

Setup first stored beam in SR.

Emery

Stored beam and injection

1200-1600

100Hz glitch detection. No Beam. May be moved earlier to 0800h if RF is not ready.

Fors

No stored beam

1600-2400

SR bpm timing/scdu

Decker
Lill
Singh

Stored beam and injection

 

Friday, 5/4/01

 

 

0000-2400

Ongoing RF conditioning

OPS

Stored beam and injection

0000-0400

Open (Beta function measurement)

OPS

Stored beam and injection

0400-0800

Response matrix measurement

Sajaev

Stored beam and injection

0800-1600

BPLD/DBPLD validation.

Pietryla

Stored beam and injection

1600-2400

SR bpm timing/scdu

Decker
Lill
Singh

Stored beam and injection

 

Saturday, 5/5/01

 

 

0000-2400

Ongoing RF conditioning

OPS

Stored beam and injection

0000-0800

Open (Beta function measurement)

OPS

Stored beam and injection

0300-0500

Operator PAR training

OPS

Stored beam and injection

0800-1200

Model independent analysis.

Borland
Wang
Sajaev

Stored beam and injection

1200-1600

Cerenkov counter checkout

Emery
Pietryla

Stored beam and injection

1600-2000

ID4 CPU commissioning (phase 0)

Emery
Vasserman
and others

Stored beam and injection

2000-2400

Open (Beta function measurement)

OPS

Stored beam and injection

 

Sunday, 5/6/01

 

 

0000-2400

Ongoing RF conditioning

OPS

Stored beam and injection

0000-1200

Open (Beta function measurement)

OPS

Stored beam and injection

0300-0500

Operator PAR training (parasitic to beta function masurement)

OPS

Stored beam and no injection

0800-1200

RT/DC orbit correction overlap compensation.

Emery
Schwartz

Stored beam and injection

1200-1600

Pinhole camera resolution measurement. (Need 35BM shutters open)

Yang

Stored beam and injection

1600-2100

Xbpm Data acquisition work

Hahne
Erwin

Stored beam and injection

2100-2300

Operator SR training (canceled if RF conditioning is not close to 100 mA)

OPS

Stored beam and no injection

2300-2400

Open (Beta function measurement)

OPS

Stored beam and injection

 

Monday, 5/7/01

 

 

0000-0800

Ongoing RF conditioning

OPS

Stored beam and injection

0000-0700

Open (Beta function measurement)

 

OPS

Stored beam and injection

0700-0800

Operator SR training

OPS

Stored beam and injection

0800-0800

Expect to have reached 100 mA after 4 days of conditioning.

 

Stored beam and injection

0800-0830

SR RF sitch-over

RF

Stored beam and injection

0800-1600

SR P1 offset measurement

OPS

Stored beam and injection

1000-1100

OAG applications demonstration to visitors

Borland

Stored beam and injection

1600-2400

SR Xbpm/P0 study

Hahne
Lester
Singh

Stored beam and injection

 

Tuesday, 05/08/01

 

 

0000-0700

Single bunch instability imaging.

Yang

Stored beam and injection

0700-0900

Operator SR training

OPS

Stored beam and injection

0900-1500

Single bunch instab vs. amplitude-dep. tune shift

Harkay

Stored beam and injection

1500-1600

Operator SR training

OPS

Stored beam and injection

1600-2400

Orbit work and intensity scan.

Singh
Erwin

Stored beam and injection

 

Wednesday, 5/9/01

 

 

0000-0300

Converging beta

Sajaev

Stored beam, and injection

0300-0700

Bunch cleaning

Yao

Stored beam, and injection

0700-0800

Setup for User beam

OPS

Stored beam, and injection