Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 5/15/01
|
|
|
0730-0930
|
Replace transistor on RFG-1 in linac.
|
Klick
|
No stored beam, no
injection
|
0800-0900
|
Switch RF, MPS validation, and other checks.
|
RF
|
No stored beam
|
0800-0900
|
Test a mapping database for DBPLDs
|
Lenkszus
|
No stored beam
|
0800-0900
|
New bitbus communication controller in IOCS1VP
|
Stein
|
No stored beam
|
0800-0900
|
S35ID and BM front end work. Trips MPS.
|
Mohan
|
No stored beam
|
0800-0900
|
Griswald flow meter work. Trips MPS
|
Putnam
|
No stored beam
|
0930-1000
|
Reboot test with beam
|
Dimonte
|
Stored beam and injection
|
1000-1230
|
SR lattice characterization
|
Emery
|
Stored beam and injection
|
1230-1430
|
Operator SR training
|
OPS
|
Stored beam and injection
|
1430-1530
|
Model independent analysis.
|
Borland
Wang
Sajaev
|
Stored beam and injection
|
1530-1600
|
User beam setup.
|
OPS
|
Stored beam and injection
|