Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 5/21/01
|
|
|
0800-0900
|
RF tuner investigations. Triplets fill test.
|
RF
|
Stored beam and injection
|
0900-1000
|
RF tuner investigations. Singlets fill test.
|
RF
|
Stored beam and injection
|
1000-1200
|
Multiple accesses below are linked to the Zone F access. Zome F access time may be adjusted on short notice on Monday morning.
|
|
No stored beam and no injection
|
1000-1200
|
Linac access for diagnostic upgrades, RF validations, checking placement of RF waveguide.
|
AOD-DIA
OPS/RF
ASD-VAC
|
No stored beam and no injection
|
1000-1200
|
Booster access for interleaving magnets, inspect extraction kicker magnet. Use time to inspect/repair septum PS water hoses outside the tunnel.
|
ASD-ME
ASD-PS
|
No stored beam and no injection
|
1000-1200
|
RF tuner investigations. Zone F tunnel access to check HOM cable.
|
RF
|
No stored beam and no injection
|
1000-1200
|
Zone A access for XBPM stage repair, radiation foils
|
AOD-DIA
AOD-ADM
|
No stored beam and no injection
|
1000-1200
|
ID22 PSS validation
|
AOD-ISI
|
Stored beam and injection
|
1200-1600
|
RF tuner investigations. Further investigations
|
RF
|
Stored beam and injection
|
1600-2000
|
ID22 shielding verification. 10 mA/30 mA
|
AOD-BO
|
Stored beam and injection
|
1600-1700
|
Model Independent Analysis
|
Sajaev
|
Stored beam and injection
|
1700-2000
|
Setup RT/DC overlap compensation for vertical plane. Check performance with gap closings.
|
Emery
Schwartz
|
Stored beam and injection
|
2000-2100
|
SR operator training (I)
|
OPS
|
Stored beam and injection
|
2100-2400
|
Xbpm RF bpm. Setting up new timing system for operations.
|
Decker
Singh
|
Stored beam and injection
|
|
Tuesday, 5/22/01
|
|
|
0000-0500
|
Xbpm RF bpm
|
Decker
Singh
|
Stored beam and injection
|
0500-0700
|
SR operator training (II)
|
OPS
|
Stored beam and injection
|
0700-1100
|
Imaging of single bunch instabilities.
|
Yang
|
Stored beam and injection
|
1100-1500
|
ID22 shielding verification. 10 mA/30 mA
|
AOD-BO
|
Stored beam and injection
|
1100-1500
|
CPU compensation
|
Emery
XFD
|
Stored beam and injection
|
1300-1500
|
Parasitic work in FEEPS rack (may trip MPS)
|
Friedman
|
Stored beam and injection
|
1500-1900
|
Top-up/interleaving software.
|
Lenkszus Borland
|
Stored beam and injection
|
1900-2000
|
SR operator training (III)
|
OPS
|
Stored beam and injection
|
2000-2400
|
SR low-emittance setup
|
Emery
|
Stored beam and injection
|
|
Wednesday, 5/22/01
|
|
|
0000-0300
|
Thermal effects on orbit.
|
Emery
|
Stored beam and injection
|
0300-0600
|
Injection detection and vertical scraper positioning with cerenkov detectors.
|
Emery
|
Stored beam and injection
|
0600-0730
|
Pinhole camera resolution.
|
Emery
Yang
|
Stored beam and injection
|
0730-0800
|
User beam setup.
|
OPS
|
Stored beam and injection
|