Machine Studies

Schedule for Run2-3,2000

May 21st, 0800 - May 23rd, 1600

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 5/21/01

 

 

0800-0900

RF tuner investigations. Triplets fill test.

RF

Stored beam and injection

0900-1000

RF tuner investigations. Singlets fill test.

RF

Stored beam and injection

1000-1200

Multiple accesses below are linked to the Zone F access. Zome F access time may be adjusted on short notice on Monday morning.

 

No stored beam and no injection

1000-1200

Linac access for diagnostic upgrades, RF validations, checking placement of RF waveguide.

AOD-DIA
OPS/RF
ASD-VAC

No stored beam and no injection

1000-1200

Booster access for interleaving magnets, inspect extraction kicker magnet. Use time to inspect/repair septum PS water hoses outside the tunnel.

ASD-ME
ASD-PS

No stored beam and no injection

1000-1200

RF tuner investigations. Zone F tunnel access to check HOM cable.

RF

No stored beam and no injection

1000-1200

Zone A access for XBPM stage repair, radiation foils

AOD-DIA
AOD-ADM

No stored beam and no injection

1000-1200

ID22 PSS validation

AOD-ISI

Stored beam and injection

1200-1600

RF tuner investigations. Further investigations

RF

Stored beam and injection

1600-2000

ID22 shielding verification. 10 mA/30 mA

AOD-BO

Stored beam and injection

1600-1700

Model Independent Analysis

Sajaev

Stored beam and injection

1700-2000

Setup RT/DC overlap compensation for vertical plane. Check performance with gap closings.

Emery
Schwartz

Stored beam and injection

2000-2100

SR operator training (I)

OPS

Stored beam and injection

2100-2400

Xbpm RF bpm. Setting up new timing system for operations.

Decker
Singh

Stored beam and injection

 

Tuesday, 5/22/01

 

 

0000-0500

Xbpm RF bpm

Decker
Singh

Stored beam and injection

0500-0700

SR operator training (II)

OPS

Stored beam and injection

0700-1100

Imaging of single bunch instabilities.

Yang

Stored beam and injection

1100-1500

ID22 shielding verification. 10 mA/30 mA

AOD-BO

Stored beam and injection

1100-1500

CPU compensation

Emery
XFD

Stored beam and injection

1300-1500

Parasitic work in FEEPS rack (may trip MPS)

Friedman

Stored beam and injection

1500-1900

Top-up/interleaving software.

Lenkszus Borland

Stored beam and injection

1900-2000

SR operator training (III)

OPS

Stored beam and injection

2000-2400

SR low-emittance setup

Emery

Stored beam and injection

 

Wednesday, 5/22/01

 

 

0000-0300

Thermal effects on orbit.

Emery

Stored beam and injection

0300-0600

Injection detection and vertical scraper positioning with cerenkov detectors.

Emery

Stored beam and injection

0600-0730

Pinhole camera resolution.

Emery
Yang

Stored beam and injection

0730-0800

User beam setup.

OPS

Stored beam and injection