Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 06/18/01
|
|
|
0800-1000
|
Repair 3AP1 and 3AP0 BPMs
|
Erwin
|
No beam
|
0800-1100
|
Replace Griswold cartridges, needs to shutdown power supplies
|
Putnam
|
No beam
|
0800-1000
|
replace a motor on the ID in Sector 3US and inspect 3/4 ID chambers
|
Grimmer
|
No beam
|
1200-2000
|
ID X-ray bpm studies
|
Decker
|
Stored beam & injection
|
2000-2100
|
Software test with beam
|
Emery
|
Stored beam & injection
|
2100-2400
|
Operator training or BPM Offset measurement
|
OPS
|
Stored beam & injection
|
|
Tuesday, 06/19/01
|
|
|
0000-0800
|
Operator training or BPM Offset measurement
|
OPS
|
Stored beam and injection
|
0000-0800
|
Examine machine performance with elevated process water temperatures (82 degree F, 86 degree F and 90 degree F).
|
Swetin
|
Stored beam and injection
|
0800-1200
|
RF cavity studies with beam
|
Nassiri
|
Stored beam and injection
|
1100-1900
|
8 hours (no SR injection) to install and test new
filter caps in the
booster Quad power supplies
|
McNamara
Kudirka
|
Stored beam, no injection
|
1100-1900
|
Work on linac water pump station
|
Dortwegt
|
No injection
|
1100-1200
|
Access to the Booster to get the perimeters on the Booster Bypass Quad and corrector magnets
|
Hillman
|
No injection
|
1900-2400
|
Bunch cleaning studies
|
Yao
|
Stored beam and injection
|
|
Wednesday, 06/20/01
|
|
|
0000-0600
|
Operator training or Offset measurement
|
OPS
|
Stored beam and injection
|
0600-0800
|
Ready for top up user beam
|
OPS
Yao
Emery
|
Stored beam and injection
|