Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 08/07/01
|
|
|
0800-0830
|
Waveguide switch to RF1/RF3 and perform ACIS/MPS validation
|
Forrestal
Arnold
OPS
|
No beam
|
0830-1000
|
Replace Griswold catridge in selected sector
|
Putnam
|
No beam
|
0830-1000
|
Remove and Replace fiber optic components used to link the P0 timing signal between the MCR and ICR. PAR Extraction will be inhibited briefly
|
Lenkszus
|
No beam
|
0800-1000
|
Install fiber interface boards on selected sector
|
Hillmana
|
No beam
|
1000-1200
|
RF2 phase loop trouble shooting. Reboot test of iocrf3hvps and iocrfsource.
|
Nassiri
Horan
Dimonte
|
Stored beam and injection
|
1200-1400
|
Xray BPM study
|
Singh
Decker
|
Stored beam and injection
|
1400-1530
|
DC/RT overlap study
|
Emery
Schwartz
|
Stored beam and injection
|
1530-1600
|
Ready for user beam
|
Yao
OPS
|
Stored beam and injection
|
|
End of Studies
|
|
|