Machine Studies

Schedule for Run3-3,2001

August 13, 0800 - August 15, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 08/13/01

 

 

0800-1000

Tour of linac and leutl tunnel, linac in AA mode

Milton

No beam

0800-0900

RG2 Tune measurement

Nassiri

No beam

0800-0900

Install a microphone in the bunch compressor area

Pasky

No beam

0800-1000

Linac ioc network hardware replacement

Maclean

No beam

0800-0900

Install trigger and interlock cards

Grelick

No beam

0800-1000

Change clogging Griswold units in selected sectors, needs to turn off magnet supplies.

Putnam

No beam

0800-1200

Replace RF2 klystron

Horan

No beam

0800-1200

Replace RF rad. monitor at RF4

Jefferson

No beam

0800-1200

PS fiber board installation in selected sectors

Hillman

No beam

0800-1100

Disable control power temperature fault in converters

Fors

No beam

1100-1400

Investigate SR dipole current problem

J. Wang

Fors

No beam

1100-1200

PAR RF studies

T. Smith

PAR injection

1200-1600

Conditioning RF2 new klystron, possibly with beam.

Horan

Stored beam and injection

1400-1500

SR Operator training

OPS

Oakley

Stored beam and injection

1600-2400

Low emittance studies

Emery

Stored beam and injection

 

Tuesday, 08/14/01

 

 

0000-0700

Timing scan/orbit feedback

Singh

Decker

Stored beam and injection

0700-0800

Operator training

Oakley

OPS

Stored beam and injection

0800-1200

Single bunch instability

Harkay

Lessner

Store beam and injection

1200-1700

topup test in low emittance lattice with 2 nC from linac

Borland

Stored beam and injection

1200-1700

ADC 750 test

Emery

Store beam and injection

1200-1700

ID feedforward studies

Sereno

Store beam and injection

1700-2100

Injection efficiency studies with Cerekov detector

Emery

Stored beam and injection

2100-2400

ID chamber impedance

Emery

Stored beam and injection

 

Wednesday, 08/15/01

 

 

0000-0700

low current narrow band bpm study

 

Singh

Decker

Stored beam and injection

0700-0800

Ready for user beam

Yao

OPS

Stored beam and injection

 

End of Studies