Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 08/21/01
|
|
|
0800-0815
|
RF3 HVPS IOC reboot
|
Dimonte
|
No beam
|
0815-0915
|
Tying Johnson controls, control devices near 514
|
Andrew
Stevens
|
No beam
|
0815-0915
|
Re-install UPS on 6ID FE EPS/PSS
|
Friedman
|
No beam
|
0815-0900
|
Increase memory of iocsrscope
|
Gunerson
|
No beam
|
0815-1015
|
Change out more griswolds in the absorber circuits
|
Putnam
|
No beam
|
0815-1015
|
Backflush the water path for S27B:Q4
|
Carwardine
|
No beam
|
0815-1015
|
Repair water leak in S4A:V2
|
Carwardine
|
No beam
|
0815-0845
|
Waveguide switch to RF2/4
|
Horan
|
No beam
|
0815-1015
|
Investigate Dac problem with S32/33
|
Carwardine
|
No beam
|
0815-1200
|
Continue fiber receiver installation.
|
Hillman
|
No beam
|
0815-1200
|
Continue bypassing water OT interlock in Zone E
|
Fors
|
No beam
|
0815-1100
|
Verify wiring of booster bypass PSs
|
Hillman
|
No beam
|
1100-1200
|
Booster RF frequency change test
|
Sereno
|
No beam
|
0845-1200
|
RF conditioning without beam
|
Horan
Grelick
|
No beam
|
1200-1330
|
RF conditioning beam
|
Horan
Grelick
|
Stored beam and injection
|
1200-1330
|
Operator training
|
Sawatski
OPS
|
Stored beam and injection
|
1330-1530
|
Test various software with beam
|
Emery
|
Stored beam and injection
|
1530-1600
|
Ready for user beam
|
Yao
OPS
|
Stored beam and injection
|
|
End of Studies
|
|
|