Machine Studies

Schedule for Run3-5,2001

August 27, 0800 - August 29, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 08/27/01

 

 

0800-1100

Linac access to check RG2 gun cathode

current value

Gagliano

No beam

0800-1000

Replace griswold in selected SR sectors

Putnam

 

No beam

0800-1100

Bring on second train of polishing resins to APS treatment system in building 450.

Dortwegt

No beam

0800-0900

S10Q4 and S28B:H1 replacement

Carwardine

PS

No beam

0800-1200

Fiber board installation

Hillman

 

No beam

0800-1200

Continue wiring verification to booster bypass LET power supply racks

Hillman

No beam

0900-1100

Trouble shoot S38A:S2 problem

Carwardine

PS

No beam

1200-1500

Investigate S36/C1 tuner movement problem

Nassiri

Stored beam and injection

1200-1500

RF2 tuning with beam

Horan

 

Stored beam and injection

1500-1900

Low emittance lattice optimization

Emery

Stored beam and injection

1900-2400

Top-up with low emittance lattice, requires 2.5 nC BTS charge

Emery

Borland

Store beam and injection

 

Tuesday, 08/28/01

 

 

0000-0300

Top-up with low emittance lattice, requires 2.5 nC BTS charge

Emery

Borland

Store beam and injection

0300-0700

TBD or operator training

OPS

Store beam and injection

0700-1300

Xbpm orbit feedback test

Singh

Decker

Stored beam and injection

1300-1500

Operator SR test

Sawatski

Yao

Stored beam and injection

1500-1530

Secure RF test area

Nassiri

Horan

Stored beam and injection

1530-1830

Single bunch instability study

Harkay

Lessner

Store beam and injection

1830-2130

Software tests with beam

Emery

Shang

Stored beam and injection

2130-2400

3+8x7 bunch pattern test

Emery

Stored beam and injection

 

Wednesday, 08/29/01

 

 

0000-0700

Hybrid/doublet fill bpm study

Singh

Decker

Store beam and injection

0700-0800

Ready for user beam

Yao

OPS

Stored beam and injection

 

End of Studies