Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 08/27/01
|
|
|
0800-1100
|
Linac access to check RG2 gun cathode
current value
|
Gagliano
|
No beam
|
0800-1000
|
Replace griswold in selected SR sectors
|
Putnam
|
No beam
|
0800-1100
|
Bring on second train of polishing resins to APS treatment system in building 450.
|
Dortwegt
|
No beam
|
0800-0900
|
S10Q4 and S28B:H1 replacement
|
Carwardine
PS
|
No beam
|
0800-1200
|
Fiber board installation
|
Hillman
|
No beam
|
0800-1200
|
Continue wiring verification to booster bypass LET power supply racks
|
Hillman
|
No beam
|
0900-1100
|
Trouble shoot S38A:S2 problem
|
Carwardine
PS
|
No beam
|
1200-1500
|
Investigate S36/C1 tuner movement problem
|
Nassiri
|
Stored beam and injection
|
1200-1500
|
RF2 tuning with beam
|
Horan
|
Stored beam and injection
|
1500-1900
|
Low emittance lattice optimization
|
Emery
|
Stored beam and injection
|
1900-2400
|
Top-up with low emittance lattice, requires 2.5 nC BTS charge
|
Emery
Borland
|
Store beam and injection
|
|
Tuesday, 08/28/01
|
|
|
0000-0300
|
Top-up with low emittance lattice, requires 2.5 nC BTS charge
|
Emery
Borland
|
Store beam and injection
|
0300-0700
|
TBD or operator training
|
OPS
|
Store beam and injection
|
0700-1300
|
Xbpm orbit feedback test
|
Singh
Decker
|
Stored beam and injection
|
1300-1500
|
Operator SR test
|
Sawatski
Yao
|
Stored beam and injection
|
1500-1530
|
Secure RF test area
|
Nassiri
Horan
|
Stored beam and injection
|
1530-1830
|
Single bunch instability study
|
Harkay
Lessner
|
Store beam and injection
|
1830-2130
|
Software tests with beam
|
Emery
Shang
|
Stored beam and injection
|
2130-2400
|
3+8x7 bunch pattern test
|
Emery
|
Stored beam and injection
|
|
Wednesday, 08/29/01
|
|
|
0000-0700
|
Hybrid/doublet fill bpm study
|
Singh
Decker
|
Store beam and injection
|
0700-0800
|
Ready for user beam
|
Yao
OPS
|
Stored beam and injection
|
|
End of Studies
|
|
|