Machine Studies

Schedule for Run3-7,2001

September 10, 0800 to September 12, 0800

Time

Descriptions

Studiers

SRStatus

 

Monday, 09/10/01

 

 

0800-0810

SR pulsed magnet waveform archiving

OPS

Store beam and injection

0800-0810

Test the reboot problem of iocrf3hvps

Dimonte

Store beam and injection

0810-1400

Fix disk problem with selene and helios

Sidorowicz

no beam

0810-0900

Install NbBPM cards

Erwin

no beam

0810-1400

Installation of CMPSI boards into FB crates

Pietryla

no beam

0810-1000

Replace griswold units

Putnam

no beam

0810-0900

Test and adjust collector interlock of RF3

Horan

no beam

0900-1100

Access to linac to inspect L5 FS7 and LTP/PAR bypass area

Berg

Beczek

pasky

no beam

0900-0930

Switch from RF3 to RF2

Horan

 

no beam

0900-1200

Parallel mode operation with RF1/RF4 (no beam)

Horan

Nassiri

no beam

0900-1100

Test dynamic corrector fiber boards without EPICS support

Hillman

No beam

1400-1600

Booster Operator test

Rivera

Banks

Booster beam

1400-1800

Software test without beam

Emery

Shang

No beam

1400-1800

Test dynamic corrector fiber boards with EPICS support

Hillman

No beam

1800-2200

Injection with DC injection bump

Chae

Emery

Store beam and injection

 

2200-2400

Response matrix study and beta function correction

Sajaev

Emery

Store beam and injection

 

Tuesday, 09/11/01

 

 

0000-0200

Response matrix study and beta function correction

Sajaev

Emery

Store beam and injection

0200-0600

Nonlinear tune dependence measurement

Sajaev

Store beam and injection

0600-1000

Standardize to low emittnace lattice, then start BPM timing scan

Singh

Store beam and injection

1000-1200

Parallel mode operation with RF1/RF4 with beam

Horan

Nassiri

Store beam and injection

1200-1400

Operator SR test

Oakley

Yao

Store beam and injection

1200-1400

Operator booster test

Rivera

Banks

Store beam and injection

1400-2000

Orbit feedback study

Singh

Store beam and injection

2000-2400

Local impedance measurement

Emery

Store beam and injection

 

 

Wednesday, 09/12/01

 

 

0000-0400

Low emittance study

Emery

Store beam and injection

0400-0800

Top-up low emittance

Emery

OPS

Store beam and injection

0800

Ready for user beam with low emittance and top-up

Yao

OPS

Stored beam and injection

 

End of Studies