Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 09/10/01
|
|
|
0800-0810
|
SR pulsed magnet waveform archiving
|
OPS
|
Store beam and injection
|
0800-0810
|
Test the reboot problem of iocrf3hvps
|
Dimonte
|
Store beam and injection
|
0810-1400
|
Fix disk problem with selene and helios
|
Sidorowicz
|
no beam
|
0810-0900
|
Install NbBPM cards
|
Erwin
|
no beam
|
0810-1400
|
Installation of CMPSI boards into FB crates
|
Pietryla
|
no beam
|
0810-1000
|
Replace griswold units
|
Putnam
|
no beam
|
0810-0900
|
Test and adjust collector interlock of RF3
|
Horan
|
no beam
|
0900-1100
|
Access to linac to inspect L5 FS7 and LTP/PAR bypass area
|
Berg
Beczek
pasky
|
no beam
|
0900-0930
|
Switch from RF3 to RF2
|
Horan
|
no beam
|
0900-1200
|
Parallel mode operation with RF1/RF4 (no beam)
|
Horan
Nassiri
|
no beam
|
0900-1100
|
Test dynamic corrector fiber boards without EPICS support
|
Hillman
|
No beam
|
1400-1600
|
Booster Operator test
|
Rivera
Banks
|
Booster beam
|
1400-1800
|
Software test without beam
|
Emery
Shang
|
No beam
|
1400-1800
|
Test dynamic corrector fiber boards with EPICS support
|
Hillman
|
No beam
|
1800-2200
|
Injection with DC injection bump
|
Chae
Emery
|
Store beam and injection
|
2200-2400
|
Response matrix study and beta function correction
|
Sajaev
Emery
|
Store beam and injection
|
|
Tuesday, 09/11/01
|
|
|
0000-0200
|
Response matrix study and beta function correction
|
Sajaev
Emery
|
Store beam and injection
|
0200-0600
|
Nonlinear tune dependence measurement
|
Sajaev
|
Store beam and injection
|
0600-1000
|
Standardize to low emittnace lattice, then start BPM timing scan
|
Singh
|
Store beam and injection
|
1000-1200
|
Parallel mode operation with RF1/RF4 with beam
|
Horan
Nassiri
|
Store beam and injection
|
1200-1400
|
Operator SR test
|
Oakley
Yao
|
Store beam and injection
|
1200-1400
|
Operator booster test
|
Rivera
Banks
|
Store beam and injection
|
1400-2000
|
Orbit feedback study
|
Singh
|
Store beam and injection
|
2000-2400
|
Local impedance measurement
|
Emery
|
Store beam and injection
|
|
Wednesday, 09/12/01
|
|
|
0000-0400
|
Low emittance study
|
Emery
|
Store beam and injection
|
0400-0800
|
Top-up low emittance
|
Emery
OPS
|
Store beam and injection
|
0800
|
Ready for user beam with low emittance and top-up
|
Yao
OPS
|
Stored beam and injection
|
|
End of Studies
|
|
|