Machine Studies

Schedule for Run3-8,2001

September 18, 0800 to 1600

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 09/18/01

 

 

0800-0900

Switch from RF3 to RF2 to inspect matching xformer problem, switch to RF1/RF4 for parallel operation

Trento

Horan

No beam

0800-0900

change griswolds in some sectors

Putnam

No beam

0800-0830

replace sextupole if still needed

PS group

No beam

0900-1100

Switch to RF1/RF4 for parallel operation, and then switch back, machine must be back to normal by 1100

Horan

Nassiri

Store beam and injection

1100-1530

Hybrid fill configuration and bpm setup

Singh

Emery

Store beam and injection

1530-1600

Ready for user beam

Yao

OPS

Stored beam and injection

 

End of Studies