Machine Studies

Schedule for Run4-2,2000

Nov 6th, 0800 - Nov 6th, 1600

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 11/6/01

 

 

0800-0815

Collect Xray BPM data with standard lattice

Singh

Stored beam and injection

0815-1000

Standardize to low-emittance lattice, optimize injection, and make measurements at 100 mA.

Emery
Sajaev
Harkay

Stored beam and injection

0815-0830

Measure pulsed magnet wabeforms during magnet standardization.

Yao

No beam

1000-1030

Replace bad correctors

PS group

No beam

1030-1200

Standardize to a corrected low-emittance lattice and make measurements.

 

Emery
Sajaev
Harkay

Stored beam and injection

1200-1220

Choose which of the two low-emittance configurations to run.

Emery

Stored beam and injection

1220-1600

Run top-up on the better low-emittance configuration.

Emery

Stored beam and injection

1400-1600

Close gaps and steer some ID source points.

Singh

Stored beam and injection