Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 11/12/01
|
|
|
0800-0810
|
Acquiring SR kicker/Septum waveforms
|
OPS
|
Store beam and injection
|
0800-1000
|
Investigate L1 modulator arcing
|
Pasky
Meyer
|
No beam
|
0810-1010
|
Insert stainless steel coils into griswolds in the absorber circuits
|
Putnam
|
no beam
|
0800-1200
|
study and try to identify the noise on the AC
power line that has been causing problems for the gun heater and supplies in the rack
|
Markovich
|
No beam
|
0810-1000
|
Re-calibrate S38 cavity over power trips to account for cable modifications.
|
Grelick
|
no beam
|
0810-1200
|
study new capacitors for the booster
quadrupole power supplies
|
J. Wang
|
No beam
|
0810-1200
|
Bring on line or repair the dynamic mode of the Storage Ring
Correctors,
S15A:H1, S23B:V3, S32B:V1 and S9A:H3 they are not working in the dynamic mode
|
Hillman
|
no beam
|
1000-1200
|
Operator training (Linac)
|
OPS
|
Linac/Par beam
|
1100-1300
|
Inter-station phase calibration with 100mA stored beam
|
Horan
Nassiri
|
Store beam and injection
|
1300-1600
|
Response matrix measurement for low emittance lattice
|
Sajaev
Emery
|
Store beam and injection
|
1600-2000
|
Characterization of the corrected lattice
|
Sajaev
Emery
|
Store beam and injection
|
2000-2400
|
Sextupole scan to improve beam lifetime of low emittance lattice and SR injection study
|
Emery
Sajaev
|
Store beam and injection
|
|
Tuesday, 11/13/01
|
|
|
0000-0300
|
Setup PC gun for SR injection, and measure SR bunch purity
|
Lewellen
|
Linac beam
|
0300-1100
|
CSR studies in the linac with PC gun
|
Borland
|
Linac beam
|
1100-1300
|
Operator training (fill the ring first for Xbpm study)
|
OPS
|
Store beam and injection
|
1300-1800
|
AC mode tune of CPU
|
Vasserman
Emery
|
Store beam and injection
|
1100-1800
|
Test Xbpm/P0 gain script (parasitic with othe study)
|
Singh
Shang
Erwin
Hahne
|
Store beam and injection
|
1800-2000
|
Test Xbpm/P0 gain script
|
Singh
Shang
Erwin
Hahne
|
Store beam and injection
|
2000-2400
|
ID Xbpm work
|
Decker
Singh
|
Store beam and injection
|
|
Wednesday, 11/14/01
|
|
|
0000-0300
|
SR orbit work
|
Singh
Decker
|
Store beam and injection
|
0300-0700
|
Low emittance lattice/top-up study
|
Emery
Sajaev
|
Store beam and injection
|
0700-0800
|
Ready for user beam with low emittance and top-up
|
Yao
OPS
|
Stored beam and injection
|
|
End of Studies
|
|
|