Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Thursday, 11/22/01
|
|
|
0000-0200
|
PAR training.
|
Sutton
OPS
|
Stored beam and no injection
|
0200-0700
|
SR BPM offset measurements
|
OPS
|
Stored beam and no injection
|
0700-0900
|
SR training
|
Rivera
OPS
|
Stored beam and injection
|
0900-2100
|
CSR studies on linac
|
Borland
|
Stored beam and occasional injection
|
1000-1400
|
ID4 CPU perturbation correction
|
Vasserman
Emery
Makarov
|
Stored beam and occasional injection
|
2100-2300
|
Linac training.
|
Hill
OPS
|
Stored beam and injection
|
2300-2400
|
Linac training
|
Sutton
OPS
|
Stored beam and no injection
|
|
Friday, 11/23/01
|
|
|
0000-0100
|
Linac training (cont'd)
|
Sutton
OPS
|
Stored beam and no injection
|
0100-0700
|
BPM offset measurements
|
OPS
|
Stored beam and injection
|
0700-0800
|
Standardize and prepare low-emittance top-up
|
OPS
|
Stored beam and injection
|