Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 12/11/01
|
|
|
0800-0830
|
Collect ID Xbpm reference data.
|
Singh
|
Stored beam and injection
|
0830-0930
|
High emittance lattice setup with singlets.
Minimum coupling, injection, lifetime.
|
Emery
Sajaev
|
Stored beam and injection
|
0930-1100
|
Orbit recovery for P0 and BM bpms.
Collect ID Xbpm data.
|
Singh
Emery
|
Stored beam and injection
|
1100-1200
|
Fill 3+7x8 with 13 mA in triplet.
Update bpm offset database.
|
Singh
|
Stored beam and injection
|
1200-1300
|
Intensity scan with 3+7x8.
|
Singh
|
Stored beam and injection
|
1300-1400
|
Check coupling, injection, lifetime.
|
Emery
Sajaev
|
Stored beam and injection
|
1300-1530
|
RF switch RF3-> RF2.
Track down the problem with RF2.
Possible switch to RF3.
|
RF group
|
Stored beam and injection
|
1530-1600
|
Prepare for high-emittance fill.
|
OPS
|
Stored beam and injection
|