Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 12/18/01
|
|
|
0800-0900
|
ID16 shielding verification
|
Job
|
Stored beam and injection
|
0900-1000
|
SR Operator training
|
OPS
|
Stored beam and injection
|
1000-1200
|
Orbit database adjustments
|
Singh
|
Stored beam and injection
|
1200-1230
|
Replace flow meter at RF hybrid
|
ME group
|
No stored beam
|
1200-1230
|
DBPLD swap
|
Pietryla
|
No stored beam
|
1230-1330
|
Test SR injection energy knob
|
Emery
Chae
|
Stored beam and injection
|
1330-1530
|
ID4-CPU correction studies
|
Emery
Vasserman
Makarov
Sereno
|
Stored beam and injection
|
1300-1530
|
RF HOM measurements. Needs singlets
bunch pattern. Parasitic to ID4-CPU
studies.
|
Song
|
Stored beam and injection
|
1530-1600
|
Prepare for high-emittance fill.
|
OPS
|
Stored beam and injection
|