Machine Studies

Schedule for Run1-11,2002

04/01, 0800 to 04/03,0800

Time

Descriptions

Studiers

SRStatus

 

Monday, 04/01/02

 

 

0800-1000

100mA, singlets pattern with top-up

Emery

Borland

Sereno

Singh

Yao

Horan

Users

Stored beam and injection

1000-1100

115mA, singlets pattern with top-up

Same as above

Stored beam and injection

1100-1600

130mA, singlets pattern with top-up

Same as above

Stored beam and injection

1600-1800

SR operator training

Sutton

OPS

Stored beam and injection

1800-2200

BPL polynomial tests

Singh

Lenkszus

Stored beam and injection

2200-2400

P0 Calibration

Singh

Stored beam and injection

 

Tuesday, 04/02/02

 

 

0000-0200

P0 Calibration

Singh

No beam

0200-0600

Orbit offset measurement

Sajaev

Emery

Stored beam and injection

0600-1000

CPU AC mode correction

Emery

Vasserman

Stored beam, No injection

0600-0800

Access linac/par to connect interleaving LTP-B1

Carwardine

PS group

No injection

0600-0800

Check booster Quad cap's

PS group

No injection

0600-0800

Remove damaged kicker PFN cable from PAR tunnel

PS group

No injection

0600-0800

Investigate MPEOB reset for PAR/Linac

Carwardine

PS group

No injection

1000-1200

LTP-B1 study, Restore SR beam at the end of study

Borland

Stored beam, no injection

1000-1200

Replace dosimeters in Zone A, control access.

Petra

No beam

1000-1200

Remove S15 trim supplies and install trim supplies in S16 through 19

Carwardine

PS group

No beam

1000-1200

Remove S15 trim supplies and install trim supplies in S16 through 19

Carwardine

PS group

No beam

1200-1400

DC -vs-pulsed beam pointing stability test, may need to inject if beam is lost.

Lewellen

Stored beam, no injection

1300-1600

Shielding verification on ID-16, injector available after 1400

Mohan

EFO

Stored beam and injection

1400-1500

PAR operator training

Hill

OPS

Stored beam and injection

1600-1800

SR operator training

Sutton

OPS

Stored beam and injection

1600-1800

Increase the DC bump at the PAR septum

Borland

 

Stored beam and injection

1600-1800

booster impurity study using hpVSA

Sereno

Stored beam and injection

1800-2200

RG2->Booster injection

Borland

Sereno

Stored beam and injection

2200-2400

Collect turn-by-turn injection dat

C. Wang

Stored beam and injection

 

Wednesday, 04/03/02

 

 

0000-0400

Injection efficiency investigation

Emery

Stored beam and injection

0400-0700

Inject into +/-2.0mm aperture

Emery

Stored beam and injection

0700-0800

Ready for user beam with low emittance lattice and top-up

Ops

Yao

Stored beam, and injection

 

End of Studies