Monday, 04/01/02
|
|
|
0800-1000
|
100mA, singlets pattern with top-up
|
Emery
Borland
Sereno
Singh
Yao
Horan
Users
|
Stored beam and injection
|
1000-1100
|
115mA, singlets pattern with top-up
|
Same as above
|
Stored beam and injection
|
1100-1600
|
130mA, singlets pattern with top-up
|
Same as above
|
Stored beam and injection
|
1600-1800
|
SR operator training
|
Sutton
OPS
|
Stored beam and injection
|
1800-2200
|
BPL polynomial tests
|
Singh
Lenkszus
|
Stored beam and injection
|
2200-2400
|
P0 Calibration
|
Singh
|
Stored beam and injection
|
|
Tuesday, 04/02/02
|
|
|
0000-0200
|
P0 Calibration
|
Singh
|
No beam
|
0200-0600
|
Orbit offset measurement
|
Sajaev
Emery
|
Stored beam and injection
|
0600-1000
|
CPU AC mode correction
|
Emery
Vasserman
|
Stored beam, No injection
|
0600-0800
|
Access linac/par to connect interleaving LTP-B1
|
Carwardine
PS group
|
No injection
|
0600-0800
|
Check booster Quad cap's
|
PS group
|
No injection
|
0600-0800
|
Remove damaged kicker PFN cable from PAR tunnel
|
PS group
|
No injection
|
0600-0800
|
Investigate MPEOB reset for PAR/Linac
|
Carwardine
PS group
|
No injection
|
1000-1200
|
LTP-B1 study, Restore SR beam at the end of study
|
Borland
|
Stored beam, no injection
|
1000-1200
|
Replace dosimeters in Zone A, control access.
|
Petra
|
No beam
|
1000-1200
|
Remove S15 trim supplies and install trim supplies in S16 through 19
|
Carwardine
PS group
|
No beam
|
1000-1200
|
Remove S15 trim supplies and install trim supplies in S16 through 19
|
Carwardine
PS group
|
No beam
|
1200-1400
|
DC -vs-pulsed beam pointing stability test, may need to inject if beam is lost.
|
Lewellen
|
Stored beam, no injection
|
1300-1600
|
Shielding verification on ID-16, injector available after 1400
|
Mohan
EFO
|
Stored beam and injection
|
1400-1500
|
PAR operator training
|
Hill
OPS
|
Stored beam and injection
|
1600-1800
|
SR operator training
|
Sutton
OPS
|
Stored beam and injection
|
1600-1800
|
Increase the DC bump at the PAR septum
|
Borland
|
Stored beam and injection
|
1600-1800
|
booster impurity study using hpVSA
|
Sereno
|
Stored beam and injection
|
1800-2200
|
RG2->Booster injection
|
Borland
Sereno
|
Stored beam and injection
|
2200-2400
|
Collect turn-by-turn injection dat
|
C. Wang
|
Stored beam and injection
|
|
Wednesday, 04/03/02
|
|
|
0000-0400
|
Injection efficiency investigation
|
Emery
|
Stored beam and injection
|
0400-0700
|
Inject into +/-2.0mm aperture
|
Emery
|
Stored beam and injection
|
0700-0800
|
Ready for user beam with low emittance lattice and top-up
|
Ops
Yao
|
Stored beam, and injection
|
|
End of Studies
|
|
|