Machine Studies

Schedule for Run1-10,2002

04/09, 0000 to 16000

Time

Descriptions

Studiers

SRStatus

 

Tuesday 04/09/02

 

 

0000-0100

Par PEM test with new LTP:B1

OPS

Stored beam and injection

0000-0100

SR operator training

Sutton

OPS

Stored beam and injection

0100-0500

Sextupole offset study

Sajaev

Stored beam and injection

0500-0730

Beam energy calibration by resonant depolarization (no injection after 0620)

Chae

Yao

Song

Stored beam and injection

0630-0730

ADC750 test with stored beam

Lenkszus

Stored beam

0630-0800

Move RF Wavetek to a new location

T. Smith

No injection

0630-0830

Linac access to install 340-to-N adapter, special LOTO (needs to run LTP:B1)

Pasky

No injection

0630-0830

Access to booster tunnel and PAR exclusion zone to verify PTB-B1/B2 polarity

Carwardine

PS group

No injection

0630-0830

LTP:B1 heartbeat test

Fors

No injection

0730-0830

CPU Noise investigation

Emery

Stored beam, No injection

0830-0930

4 mm vertical aperture VC injection injection test

Emery

Stored beam and injection

0930-1130

LTP:B1 test

Borland

Stored beam and injection

0930-1330

Datapool tests, injection possible.

Singh

Emery

Lenkszus

Shang

Stored beam and injection

1230-1330

Booster bunch purity measurement using Vector Voltmeter

Sereno

Stored beam and injection

1330-1530

BPM cogging studies

Decker

Stored beam and injection

1530-1600

Ready for user beam with top-up

OPS

Yao

Stored beam and injection

 

End of Studies