Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday 04/09/02
|
|
|
0000-0100
|
Par PEM test with new LTP:B1
|
OPS
|
Stored beam and injection
|
0000-0100
|
SR operator training
|
Sutton
OPS
|
Stored beam and injection
|
0100-0500
|
Sextupole offset study
|
Sajaev
|
Stored beam and injection
|
0500-0730
|
Beam energy calibration by resonant depolarization (no injection after 0620)
|
Chae
Yao
Song
|
Stored beam and injection
|
0630-0730
|
ADC750 test with stored beam
|
Lenkszus
|
Stored beam
|
0630-0800
|
Move RF Wavetek to a new location
|
T. Smith
|
No injection
|
0630-0830
|
Linac access to install 340-to-N adapter, special LOTO (needs to run LTP:B1)
|
Pasky
|
No injection
|
0630-0830
|
Access to booster tunnel and PAR exclusion zone to verify PTB-B1/B2 polarity
|
Carwardine
PS group
|
No injection
|
0630-0830
|
LTP:B1 heartbeat test
|
Fors
|
No injection
|
0730-0830
|
CPU Noise investigation
|
Emery
|
Stored beam, No injection
|
0830-0930
|
4 mm vertical aperture VC injection injection test
|
Emery
|
Stored beam and injection
|
0930-1130
|
LTP:B1 test
|
Borland
|
Stored beam and injection
|
0930-1330
|
Datapool tests, injection possible.
|
Singh
Emery
Lenkszus
Shang
|
Stored beam and injection
|
1230-1330
|
Booster bunch purity measurement using Vector Voltmeter
|
Sereno
|
Stored beam and injection
|
1330-1530
|
BPM cogging studies
|
Decker
|
Stored beam and injection
|
1530-1600
|
Ready for user beam with top-up
|
OPS
Yao
|
Stored beam and injection
|
|
End of Studies
|
|
|