Machine Studies

Schedule for Run1-13,2002

04/15, 0800 to 04/17,0800

Time

Descriptions

Studiers

SRStatus

 

Monday, 04/15/02

 

 

0800-1000

Install EPICS R3.13.6 on some ioc's, no stored beam and injection

Arnold

No beam

0800-1200

Install the interleaving PS PTB:B1/B2

PS group

No beam

0800-1100

Laser alignment

Li

No beam

0900-1000

Access zone-A to replace dosimeters, control access

Petra

No beam

0900-1000

Repair/replace SR converter S16B:H1 and S5B:S3

McNamara

PS group

No beam

1100-1200

Switch to RG1 for machine studies, recover linac/par beam

Pasky

No beam

1200-1500

Operate and test BTB:B1/B2 after installation

Lewellen

No beam

1300-1400

Recover stored beam

OPS

Stored beam and injection

1400-1800

CPU AC mode correction

Vasserman

Emery

Stored beam and injection

1800-2200

Lower emittance lattice study

Emery

Stored beam and injection

1400-2000

Booster RF AGC studies, may require SR injection

Horan

Stored beam and injection

1600-1800

Linac stability with and without power controllaws, SR injection possible

Borland

Stored beam and injection

2000-2200

PAR operator training

Hill

Stored beam and injection

2200-2400

Cogging test

Decker

Stored beam, no injection

 

Tuesday, 04/16/02

 

 

0000-0400

Cogging test

Decker

Stored beam, no injection

0400-0500

SR training

Shultes

Stored beam and injection

0500-0900

Injection study

C. Wang

Sajaev

Stored beam and injection

0900-1300

ID feedforward work in sector 34

Borland

Stored beam, no injection

1300-1900

Data pool test

Emery

Shang

Lenkszus

Singh

Stored beam and injection

1900-2300

Imaging injection transient

Emery

Yang

Stored beam and injection

2300-2400

Injection problem investigation in low emittance lattice

Emery

Stored beam and injection

 

Wednesday, 04/17/02

 

 

0000-0300

Injection problem investigation in low emittance lattice

Emery

Stored beam and injection

0300-0700

BPM database work for hybrid fill

Singh

Stored beam and injection

0700-0800

Ready user beam with hybrids fill and top-up

OPS

Yao

Stored beam, and injection

 

End of Studies