Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 04/15/02
|
|
|
0800-1000
|
Install EPICS R3.13.6 on some ioc's, no stored beam and injection
|
Arnold
|
No beam
|
0800-1200
|
Install the interleaving PS PTB:B1/B2
|
PS group
|
No beam
|
0800-1100
|
Laser alignment
|
Li
|
No beam
|
0900-1000
|
Access zone-A to replace dosimeters, control access
|
Petra
|
No beam
|
0900-1000
|
Repair/replace SR converter S16B:H1 and S5B:S3
|
McNamara
PS group
|
No beam
|
1100-1200
|
Switch to RG1 for machine studies, recover linac/par beam
|
Pasky
|
No beam
|
1200-1500
|
Operate and test BTB:B1/B2 after installation
|
Lewellen
|
No beam
|
1300-1400
|
Recover stored beam
|
OPS
|
Stored beam and injection
|
1400-1800
|
CPU AC mode correction
|
Vasserman
Emery
|
Stored beam and injection
|
1800-2200
|
Lower emittance lattice study
|
Emery
|
Stored beam and injection
|
1400-2000
|
Booster RF AGC studies, may require SR injection
|
Horan
|
Stored beam and injection
|
1600-1800
|
Linac stability with and without power controllaws, SR injection possible
|
Borland
|
Stored beam and injection
|
2000-2200
|
PAR operator training
|
Hill
|
Stored beam and injection
|
2200-2400
|
Cogging test
|
Decker
|
Stored beam, no injection
|
|
Tuesday, 04/16/02
|
|
|
0000-0400
|
Cogging test
|
Decker
|
Stored beam, no injection
|
0400-0500
|
SR training
|
Shultes
|
Stored beam and injection
|
0500-0900
|
Injection study
|
C. Wang
Sajaev
|
Stored beam and injection
|
0900-1300
|
ID feedforward work in sector 34
|
Borland
|
Stored beam, no injection
|
1300-1900
|
Data pool test
|
Emery
Shang
Lenkszus
Singh
|
Stored beam and injection
|
1900-2300
|
Imaging injection transient
|
Emery
Yang
|
Stored beam and injection
|
2300-2400
|
Injection problem investigation in low emittance lattice
|
Emery
|
Stored beam and injection
|
|
Wednesday, 04/17/02
|
|
|
0000-0300
|
Injection problem investigation in low emittance lattice
|
Emery
|
Stored beam and injection
|
0300-0700
|
BPM database work for hybrid fill
|
Singh
|
Stored beam and injection
|
0700-0800
|
Ready user beam with hybrids fill and top-up
|
OPS
Yao
|
Stored beam, and injection
|
|
End of Studies
|
|
|